Location

Sec.
-
Twp.
-
Rge.
-
Mer.
W6M
Select a
Range
(Rge.) first

Range

07 3 06 2
 

Results : 1 - 5 of 5

00001031-017 - Paramount Resources (ACL) Ltd.
Approved

Apache Canada Ltd. has submitted an application under the Environmental Protection and Enhancement Act (EPEA) for the renewal of an existing Approval pertaining to the Zama Sour Gas Plant located on private lands that are owned by Apache, within Mackenzie County. The Plant is located approximately 14.7 km west-southwest of Zama, Alberta and approximately 130 km northwest of High Level. In addition to the renewal of the EPEA Approval, Apache Canada Ltd. is also requesting the following changes: to add a standby emergency generator as an authorized source and to repeal clauses associated with sulphur dust monitoring and reporting as the facility no longer handles elemental sulphur (deposition is no longer a concern) and pH impacts have already been addressed. Deadline for submission of Statements of Concern is August 20, 2016 in the following location:

12-116-06W6M

 

00378455-002 - Paramount Resources (ACL) Ltd.
Approved

An application has been submitted to amend an existing approval under the Specified Enactments (Environmental Protection and Enhancement Act). The amendment is to change the ownership of the approval from Paramount Resources (ACL) Ltd. to Keyera Energy Ltd. The approval pertains to the Wapiti Sour Gas Plant. The deadline for submission of Statements of Concern is December 23, 2017 in the following location:

19-067-07W6M

 

00048877-003 - Paramount Resources (ACL) Ltd.
Approved

Paramount Resources Ltd. has submitted an application under the Environmental Protection and Enhancement Act to transfer ownership of the Blueberry Mountain Sweet Gas Plant to Cequence Energy Ltd. The deadline for submitting a statement of concern is September 28, 2018 in the following location:

16-082-07W6M

 

00378455-001 - Paramount Resources (ACL) Ltd.
Approved

Apache Canada Ltd. has submitted an application under the Environmental Protection and Enhancement Act for an approval for a new sour gas plant (Wapiti Sour Gas Plant). The Facility will have a total design flow rate of 8,384 103m3/d (~ 300 MMscfd) consisting of two (2) parallel process trains each with 4,192 103m3/d (~ 150 MMscfd) capacity. It will handle inlet process gas containing up to 5.0 % H2S. The proposed process trains at the Wapiti Sour Gas Plant will consist of inlet separation/slug catcher, Low Pressure (LP) booster compression, amine sweetening, condensate stabilization, hydrocarbon dew point control and liquids recovery, sales compression, recycle/vapour recovery systems, sour water treatment and acid gas compression. Deadline for submission of statements of concern is March 4, 2016 in the following location:

19-067-07W6M

 

00001031-015 - Paramount Resources (ACL) Ltd.
Approved

Amend or renew a previously granted EPEA approval in the following location:

12-116-06W6M