Location

Sec.
-
Twp.
-
Rge.
-
Mer.
W5M
Select a
Range
(Rge.) first

Range

18 4 20 1
 

Results : 1 - 5 of 5

00265131-003 - XTO Energy Canada ULC
Approved

XTO Energy Canada ULC has submitted an application under the Environmental Protection and Enhancement Act for an amendment to an existing approval for the Kaybob Sour Gas Plant located in LSD 15 of Section 7 Township 60 Range 18 West of the 5th Meridian (approximately 24 km southwest of Fox Creek). The application is for the surface water management design plan for a wet pond located towards the southeastern limit of the plant area in LSD 9 of Section 7 Township 60 Range 18 West of the 5th Meridian. The deadline for submitting a statement of concern is December 14, 2016 in the following location:

07-060-18W5M

 

00265131-004 - XTO Energy Canada ULC
Approved

XTO Energy Canada ULC has submitted an amendment application under the Environmental Protection and Enhancement Act for their existing Kaybob Sour Gas Plant. The amendment is for the addition of an additional inlet line heater. The deadline for submission of Statements of Concern is March 7, 2017 in the following location:

07-060-18W5M

 

00397400-001 - XTO Energy Canada ULC
Approved

To receive an EPEA code of practice application in the following locations:

01-061-20W5M
04-061-20W5M

 

00265131-005 - XTO Energy Canada ULC
Approved

XTO Energy Canada ULC has submitted an amendment application under the Environmental Protection and Enhancement Act for the Kaybob Sour Gas Plant. The amendment application is in regards to Stabilizer and Facility upgrades, this includes heater additions and flare stack modifications/replacements. The facility is approximately 22 km southwest of the town of Fox Creek, Alberta. The deadline for submission of Statements of Concern is July 14, 2018 in the following location:

07-060-18W5M

 

00265131-002 - XTO Energy Canada ULC
Approved

XTO Energy Canada Services ULC has submitted an amendment to an existing Environmental Protection and Enhancement Act approval to change the air emission sources by replacing a 715 kW heater and a 7636 kW heater with two 8792 kW hot oil heaters and will include the addition of a 220 kW fuel gas heater. The sour gas plant is currently being constructed and is being planned to be operating in July, 2014. The plant is located in LSD 15 of Section 7 Township 60 Range 18 West of the 5th Meridian (approximately 24 km southwest of the Town of Fox Creek) and will have a capacity of 4250 x 10^3m^3/d in the following location:

07-060-18W5M