Location

Sec.
-
Twp.
-
Rge.
-
Mer.
W5M
Select a
Range
(Rge.) first

Range

13 8 11 6 12 6 09 5 10 5 07 3 15 3 16 3 06 1 08 1
 

Results : 1 - 10 of 38

MLL130059-001 - Pembina Pipeline Corporation
Approved

Amend a previously approved land lease for miscellaneous purposes in the following location:

08-047-14W5M

 

1812520 - Pembina Pipeline Corporation
Approved

Application to construct and operate a pump station in the following location:

07-066-14W5M

 

LOC141765-001 - Pembina Pipeline Corporation
Approved

To receive authorization for a Licence of Occupation in the following location:

07-066-14W5M

 

PIL140732-001 - Pembina Pipeline Corporation
Approved

To receive authorization for land related to a Pipeline Installation in the following location:

07-066-14W5M

 

1832379 - Pembina Pipeline Corporation
Approved

Application to amend an existing licence for an "other" type of pipeline with less than or equal to 323.9 millimetre outside diameter (mm OD.) in the following locations:

07-048-07W5M
31-047-09W5M
04-048-09W5M
12-048-09W5M
30-047-10W5M
33-047-10W5M
20-047-11W5M
26-047-11W5M
06-047-12W5M
22-049-12W5M
21-046-13W5M
28-046-13W5M
35-046-13W5M
10-047-14W5M

 

1832777 - Pembina Pipeline Corporation
Approved

Application to amend an existing licence for an "other" type of pipeline with less than or equal to 323.9 millimetre outside diameter (mm OD.) in the following locations:

07-048-07W5M
18-048-07W5M
20-047-11W5M
06-047-12W5M
08-047-12W5M
22-047-12W5M
21-046-13W5M
12-046-14W5M

 

1833145 - Pembina Pipeline Corporation
Approved

Application to amend an existing licence for an "other" type of pipeline with less than or equal to 323.9 millimetre outside diameter (mm OD.) in the following locations:

28-046-13W5M
05-047-14W5M
08-047-14W5M
10-047-14W5M

 

00366181-001 - Pembina Pipeline Corporation
Approved

Pembina Pipeline Corporation has applied for a Water Act approval to install bank armoring structures to minimize future erosion and scour at a pipeline crossing of Chickadee Creek in 5-25-60-14-W5. Pembina proposes to install armorflex matting and rip-rap in the channel to protect the pipeline and stabilize the banks. These measures will be keyed into the native banks on either side and are intended to prevent further erosion over the pipeline and migration of the channel in the following location:

25-060-14W5M

 

00366192-001 - Pembina Pipeline Corporation
Approved

Pembina Pipeline Corporation has applied for a Water Act Approval for Constructing Works to install bank armoring structures to minimize future erosion and scour at a pipeline crossing at Baseline Creek, located in 6-25-60-14 W5. Pembina's proposed construction design includes using rip-rap to stabilize both banks; lining the channel through RoW with Class 1 rip rap; and creating drainage berms to deflect surface water away from the slump on the left bank. Deadline for submission of Statements of Concern is May 1, 2015 in the following location:

25-060-14W5M

 

00366181-002 - Pembina Pipeline Corporation
Approved

Pembina Pipeline Corporation has applied for an amendment to extend the construction completion date. Deadline for submitting Statements of Concern is September 20, 2015 in the following location:

25-060-14W5M