Decision Type

Location

Sec.
-
Twp.
-
Rge.
-
Mer.
-
Select a
Meridian
(Mer.) first

Meridian

W4M255 W5M28
 

Results : 21 - 30 of 434

1914335 - Imperial Oil Resources Limited
Approved

Imperial Oil Resources Limited Cold Lake Operations ID2001-03 Maskwa Variance.

 

1916320 - Devon Canada Corporation
Approved

Alberta Sulphur Recovery Guidelines (AER Interim Directive 2001-3) Variance Request.

 

1914490 - Devon Canada Corporation
Approved

Application to Amend Primary Recovery Scheme Approval #7936KK for Horizontal Development Request to Amend Well Spacing for Horizontal Development in the following location:

  064-06W4M

 

1914413 - Canadian Natural Resources Limited
Approved

Application to Amend Primary Recovery Scheme Approval (PRSA) No. 4746 Sections: Sections 35 and 36-054-06W4 Cold Lake Oil Sands Area - Lindbergh Sector in the following locations:

35-054-06W4M
36-054-06W4M

 

1914453 - Nexen Energy ULC
Approved

Long Lake Commercial Scheme Approval 9485, as amended Application for Long Lake Phase 3 Infill Project.

 

1916153 - Canadian Natural Resources Limited
Approved

Canadian Natural Resources Limited – Kirby In Situ Oil Sands Project –Kirby North Warm Solvent-Assisted Start-up Process Application – Scheme Approval 11475BB in the following locations:

03-075-08W4M
04-075-08W4M
09-075-08W4M
10-075-08W4M

 

1756260 - OSUM Oil Sands Corp.
Withdrawn

Osum Oil Sands Corp. (OSUM) application for approval to construct and operate the Sepiko Kesik Project. The project will include a central processing facility with a bitumen production capacity of 9,540 m3/d (60,000 bbl/d), to be constructed in two phases in the following locations:

20-085-18W4M
  086-18W4M
  087-18W4M

 

1916060 - Cenovus Energy Inc.
Approved

Christina Lake Thermal Project Directive 081 Variance Request (Category 1 amendment) 2018 Disposal Limit.

 

1915670 - Canadian Natural Resources Limited
Approved

Application to Amend Terms of Approval No. 10423.

 

1912733 - Devon Canada Corporation
Approved

Application for a new enhanced heavy oil recovery scheme for hydrocarbon gas injection involving gas cycling. (Cycle hydrocarbon gas in the wellbores for re-pressurization, followed by a production cycle to recover hydrocarbons.) in the following locations:

20-062-06W4M
21-062-06W4M