Location

Sec.
-
Twp.
-
Rge.
-
Mer.
-
Select a
Meridian
(Mer.) first

Meridian

W4M141 W5M2
 

Results : 1 - 10 of 197

1724610 - Suncor Energy Inc.
Approved

Approval No. 8668O Maximum Operating Pressure Strategy Associated with the Suncor Energy Inc. MacKay River SAGD Project in the following locations:

  093-12W4M
  092-13W4M

 

1757021 - Suncor Energy Inc.
Approved

Application to amend Approval No. 8668 - Suncor MacKay River In-Situ Oil Sands Project Pad 819 Development in the following locations:

33-092-12W4M
03-093-12W4M
04-093-12W4M

 

1773327 - Suncor Energy Inc.
Approved

Suncor Energy Inc. Firebag SAGD Project Firebag Category 2 Injection Start-Up Application - Approval No. 8870 in the following locations:

04-095-06W4M
13-095-06W4M

 

1775146 - Suncor Energy Inc.
Approved

Suncor TRO DDA2 Containment Design Report.

 

1779397 - Suncor Energy Inc.
Approved

Suncor - Firebag SAGD Project - Regional Water Mobility Tests Cat 2 Amend to Approval No. 8870 in the following locations:

31-094-05W4M
32-094-05W4M

 

1783266 - Suncor Energy Inc.
Approved

Suncor Energy Inc. - Firebag SAGD Project Firebag Water Injectivity Tests Approval No. 8870 in the following locations:

26-094-06W4M
34-094-06W4M

 

1783534 - Suncor Energy Inc.
Approved

Application to conduct Injectivity Test Program Suncor Meadow Creek Project AER Approval No. 9424 in the following locations:

29-084-08W4M
14-085-09W4M

 

1788721 - Suncor Energy Inc.
Approved

Suncor - Firebag SAGD Amendment to Approval No. 8870 Produced Water Tank Tie-in to Vapour Recovery Unit in the following location:

11-095-06W4M

 

1788659 - Suncor Energy Inc.
Approved

Suncor - Firebag Application to Amend Approval No. 8870 Implementation of Directive 81 and Clause 8 Amendment in the following locations:

04-095-06W4M
13-095-06W4M

 

1786184 - Suncor Energy Inc.
Approved

Suncor NSE Mine application to construct Phase 2 Pit East In-pit Dump, Geotechnical Design Report.