Filter By

Company

Decision Type

Location

Sec.
-
Twp.
-
Rge.
-
Mer.
-
Select a
Meridian
(Mer.) first

Meridian

W4M1119 W5M625 W6M302
 

Results : 1 - 10 of 2025

00000057-021 - Tidewater Midstream and Infrastructure Ltd.
Approved

Tidewater Midstream and Infrastructure Ltd. has requested an amendment to Ram River Sour Gas Plant approval under Environmental Protection and Enhancement Act to add a power generator and a compressor engine at the plant. Deadline for submitting a Statement of Concern is July 6, 2018 in the following location:

02-037-10W5M

 

00073203-008 - Williams Energy Canada ULC
Closed

Williams Energy Canada ULC has submitted a request to extend the expiry of the existing approval for their Fort McMurray Hydrocarbon Liquids Extraction Facility. The extension will allow the Alberta Energy Regulator time to review the renewal application that has been submitted in the following locations:

26-092-09W4M
12-092-10W4M

 

00387835-001 - Tidewater Midstream and Infrastructure Ltd.
Approved

Tidewater Midstream and Infrastructure Ltd. has submitted an application under Specified Enactments (Environmental Protection and Enhancement Act) for an approval to construct 25.15 km of 712 o.d. mm sweet natural gas pipeline called the Hythe Lateral Pipeline (west of Grande Prairie). The proposed pipeline right-of-way (ROW) will originate at a riser site at LSD 15 of Section 30 Township 71 Range 8 West of the 6th Meridian and will continue north to 2 separate riser sites located at LSD 6 of Section 19 Township 73 Range 8 West of the 6th Meridian and LSD 5 of Section 30 Township 73 Range 8 West of the 6th Meridian. The deadline for submitting a statement of concern is January 24, 2017 in the following locations:

30-071-08W6M
31-071-08W6M
06-072-08W6M
07-072-08W6M
17-072-08W6M
18-072-08W6M
20-072-08W6M
29-072-08W6M
30-072-08W6M
31-072-08W6M
06-073-08W6M
07-073-08W6M
18-073-08W6M
19-073-08W6M
30-073-08W6M
36-071-09W6M
01-072-09W6M

 

00017429-004 - Direct Energy Marketing Limited
Approved

An application has been submitted for a consent to transfer the existing Environmental Protection and Enhancement Act Code of Practice Registration for the Gilby Inlet Compressor Station from Direct Energy Marketing Limited to Canlin Energy Corporation. The deadline for submission of Statements of Concern is November 15, 2017 in the following location:

22-040-03W5M

 

00010801-013 - Gibson Energy ULC
Approved

Gibson Energy ULC has submitted an application under the Environmental Protection and Enhancement Act for an amendment of their existing approval of the Hardisty Terminal Bulk Petroleum Storage Facility. The amendment application is to obtain partial approval for the stripping and grading of the proposed development area to avoid impacts of winter construction and to obtain an approval for the construction of the six aboveground storage tanks. The deadline for submission of Statements of Concern is June 7, 2017 in the following locations:

08-042-08W4M
19-042-09W4M
20-042-09W4M
29-042-09W4M
30-042-09W4M

 

00381752-003 - Gibson Energy ULC
Approved

Amend a previously granted EPEA code of practice for Hydrostatic Testing in the following locations:

08-042-08W4M
19-042-09W4M
20-042-09W4M
29-042-09W4M
30-042-09W4M

 

00000043-009 - Logic Energy Ltd.
Approved

Logic Energy Ltd. has submitted an application under the Environmental Protection and Enhancement Act for a renewal of an existing approval for the continued operation of the Halkirk sour gas plant. The facility is located in LSD 3 of Section 36 Township 37 Range 17 West of the 4th Meridian (approximately 8 km south of Gadsby) and has a capacity of 225 x 10^3m^3/day of raw gas. The deadline for submitting a statement of concern is April 29, 2015 in the following location:

36-037-17W4M

 

00000155-022 - CNOOC Petroleum North America ULC
Approved

Nexen Energy ULC has been issued an extension to an existing approval under the Environmental Protection and Enhancement Act to allow them to follow the terms and conditions for the Balzac Sour Gas Plant. The facility is located in LSD 7 of Section 2 Township 26 Range 29 West of the 4th Meridian (approximately 4.8 km east of Balzac) and the extension will allow time to review the renewal application in the following location:

02-026-29W4M

 

00370618-001 - Hammerhead Resources Inc.
Approved

Canadian International Oil Operating Corp. has applied for an approval under EPEA to construct a power plant to service a sweet gas processing plant. The power plant will consist of three (3) x 2055 kw, (2756 bHP) 600 VAC, 3 Phase 60Hz, 1800 rpm Continuous Duty Natural Gas fuelled Generator sets in a modular, skidded, self-framing gable style building comprised of Caterpillar G3520C Engines and SR4B Alternators, including all associated radiators, exhaust systems, load bank and miscellaneous equipment. Deadline for submission of Statements of Concern is August 16, 2015 in the following location:

21-066-03W6M

 

00324831-003 - Cequence Energy Ltd.
Approved

Amend a previously granted EPEA code of practice for Compressor & Sweet Gas in the following location:

11-062-27W5M