Location

Sec.
-
Twp.
-
Rge.
-
Mer.
-
Select a
Meridian
(Mer.) first

Meridian

W6M5
 

Results : 1 - 5 of 5

00010910-016 - Veresen Midstream General Partner Inc.
Approved

Veresen Midstream General Partner Inc. has submitted an application for an amendment of their Environmental Protection and Enhancement Act approval of the Hythe-Brainard Sour Gas Plant. The amendment consists of an addition of two saskatoon boilers on the existing site. The new boilers will be fueled by sweet natural gas to heat glycol to aide in heat production requirements for plant processes. Deadline for submission of statements of concern is January 1, 2016 in the following location:

18-074-12W6M

 

00010910-017 - Veresen Midstream General Partner Inc.
Approved

Veresen Midstream General Partner Inc. has submitted an application under Specified Enactments (Environmental Protection and Enhancement Act) for a renewal of an existing approval for the Hythe-Brainard Sour Gas Processing Plant located in the N 1/2 of Section 18 Township 74 Range 12 West of the 6th Meridian (approximately 11.5 km southeast of Demmitt). The Plant has a licensed raw gas processing capacity of 6,709 x 10^3 m^3/d with a maximum of 127.8 tonnes/day of sulphur inlet. The Plant produces sweet sales gas, liquefied petroleum gas (LPG mix), C5+ condensates and sulphur. The deadline for submitting a statement of concern is April 15, 2017 in the following location:

18-074-12W6M

 

00010910-018 - Veresen Midstream General Partner Inc.
Approved

Veresen Midstream General Partner Inc. has submitted an application under the Environmental Protection and Enhancement Act for an amendment of their existing approval of the Hythe-Brainard Sour Gas Plant. The amendment is for changes to the Industrial Runoff Control System. The deadline for submission of Statements of Concern is May 24, 2018 in the following location:

18-074-12W6M

 

00010910-019 - Veresen Midstream General Partner Inc.
Approved

Veresen Midstream General Partner Inc. has submitted an application under the Environmental Protection and Enhancement Act for an amendment of their existing approval of the Hythe-Brainard Sour Gas Plant. The amendment is to increase the sour gas inlet capacity, increase the expected concentration of H2S in the sour gas inlet stream, and construct and operate a new sour gas processing train at the Plant. Additionally, Veresen Midstream is requesting several minor modifications to existing approval conditions. The deadline for submission of Statements of Concern is February 2, 2019 in the following location:

18-074-12W6M

 

00435469-001 - Veresen Midstream General Partner Inc.
Approved

Veresen Midstream General Partner Inc. and Veresen Midstream Limited Partnership (together Veresen Midstream) has submitted a Conservation and Reclamation Plan as a requirement for Environmental Protection and Enhancement Act approval for the Hythe Extension Pipeline Project (the Project). The Project consists of the construction and operation of an approximately 63.2 kilometer long, 12-inch (323.9 mm O.D.) pipeline. The purpose of the Project is to transport dehydrated sour natural gas with a hydrogen sulphide content of up to 10% from a proposed third-party field battery located at NE 28-071-09 W6M, to the Hythe Brainard Gas Plant, located at 11-18-074-12 W6M. Deadline for submission of Statements of Concern is May 31, 2019 in the following locations:

28-071-09W6M
30-071-09W6M
31-071-09W6M
32-071-09W6M
33-071-09W6M
25-071-10W6M
26-071-10W6M
27-071-10W6M
28-071-10W6M
29-071-10W6M
30-071-10W6M
31-071-10W6M
34-071-11W6M
35-071-11W6M
36-071-11W6M
03-072-11W6M
09-072-11W6M
10-072-11W6M
16-072-11W6M
19-072-11W6M
20-072-11W6M
21-072-11W6M
24-072-12W6M
25-072-12W6M
26-072-12W6M
27-072-12W6M
28-072-12W6M
29-072-12W6M
30-072-12W6M
31-072-12W6M
06-073-12W6M
07-073-12W6M
18-073-12W6M
19-073-12W6M
30-073-12W6M
18-074-12W6M
25-073-13W6M
36-073-13W6M
01-074-13W6M
12-074-13W6M
13-074-13W6M