00010910-016 - Veresen Midstream General Partner Inc.
Approved

Veresen Midstream General Partner Inc. has submitted an application for an amendment of their Environmental Protection and Enhancement Act approval of the Hythe-Brainard Sour Gas Plant. The amendment consists of an addition of two saskatoon boilers on the existing site. The new boilers will be fueled by sweet natural gas to heat glycol to aide in heat production requirements for plant processes. Deadline for submission of statements of concern is January 1, 2016 in the following location:

18-074-12W6M

 

00010910-017 - Veresen Midstream General Partner Inc.
Approved

Veresen Midstream General Partner Inc. has submitted an application under Specified Enactments (Environmental Protection and Enhancement Act) for a renewal of an existing approval for the Hythe-Brainard Sour Gas Processing Plant located in the N 1/2 of Section 18 Township 74 Range 12 West of the 6th Meridian (approximately 11.5 km southeast of Demmitt). The Plant has a licensed raw gas processing capacity of 6,709 x 10^3 m^3/d with a maximum of 127.8 tonnes/day of sulphur inlet. The Plant produces sweet sales gas, liquefied petroleum gas (LPG mix), C5+ condensates and sulphur. The deadline for submitting a statement of concern is April 15, 2017 in the following location:

18-074-12W6M

 

00010910-018 - Veresen Midstream General Partner Inc.
Approved

Veresen Midstream General Partner Inc. has submitted an application under the Environmental Protection and Enhancement Act for an amendment of their existing approval of the Hythe-Brainard Sour Gas Plant. The amendment is for changes to the Industrial Runoff Control System. The deadline for submission of Statements of Concern is May 24, 2018 in the following location:

18-074-12W6M

 

00010910-019 - Veresen Midstream General Partner Inc.
Approved

Veresen Midstream General Partner Inc. has submitted an application under the Environmental Protection and Enhancement Act for an amendment of their existing approval of the Hythe-Brainard Sour Gas Plant. The amendment is to increase the sour gas inlet capacity, increase the expected concentration of H2S in the sour gas inlet stream, and construct and operate a new sour gas processing train at the Plant. Additionally, Veresen Midstream is requesting several minor modifications to existing approval conditions. The deadline for submission of Statements of Concern is February 2, 2019 in the following location:

18-074-12W6M