Location

Sec.
-
Twp.
-
Rge.
-
Mer.
-
Select a
Meridian
(Mer.) first

Meridian

W5M27 W4M20 W6M1
 

Results : 1 - 10 of 46

00388947-002 - Shell Canada Limited
Approved

Shell Canada Limited has submitted an amendment application under the Environmental Protection and Enhancement Act for an Authorization to use treated final effluent from The Town of Fox Creek's municipal wastewater lagoon for the purpose of hydraulic fracturing. The amendment is to add the FC 233 point of use in NW 27-63-20-W5M in the following locations:

33-062-19W5M
07-063-19W5M
14-063-20W5M
21-063-20W5M
27-063-20W5M
33-063-20W5M
05-064-20W5M
10-064-20W5M

 

00011587-014 - Shell Canada Limited
Approved

Shell Canada Limited has submitted an application under the Environmental Protection and Enhancement Act for an amendment to their existing approval of the Jumping Pound Sour Gas Plant. The amendment is for the addition of a 2,665 kilowatt natural gas gnerator. The power generated from this equipment will all be used internally and there will be no power export as a result of this project. The deadline for submission of Statements of Concern is April 12, 2017 in the following locations:

13-025-05W5M
23-025-05W5M
24-025-05W5M

 

00388947-003 - Shell Canada Limited
Withdrawn

Shell Canada Limited has submitted an amendment application under the Environmental Protection and Enhancement Act for an Authorization to use treated final effluent from The Town of Fox Creek's municipal wastewater lagoon for the purpose of hydraulic fracturing. The amendment is to add the FC 47 point of use in NE 05-064-20-W5M in the following locations:

33-062-19W5M
07-063-19W5M
14-063-20W5M
21-063-20W5M
27-063-20W5M
33-063-20W5M
05-064-20W5M
10-064-20W5M

 

00020809-014 - Shell Canada Limited
Approved

In accordance with the Responsible Energy Development Act (REDA), Shell Canada Limited has submitted an application under the Environmental Protection and Enhancement Act for a renewal of an existing approval for the continued operation of the Muskeg River Oil Sands Processing Plant and Mine, including the Muskeg River Mine Expansion, collectively referred to as the Muskeg River Mine (MRM). Shell Canada Limited has also submitted an application under the Water Act to renew an existing approval (00071828-00-00) and Licence (00071821-01-00). The application numbers are 012-00071821 and 019-00071828. The integrated application covers ongoing, previously approved construction, operation and reclamation activities at MRM. No new activities, equipment, emissions, locations or impacts are included in this application. The Muskeg River Mine is located about 70 km north of Fort McMurray, Alberta. The deadline for submitting a statement of concern is January 27, 2017 in the following locations:

00-094-09W4M
00-095-09W4M
00-094-10W4M
23-095-10W4M
00-094-11W4M
00-095-11W4M

 

00020809-015 - Shell Canada Limited
Approved

Shell has applied under section 13 of OSCA, sections 80 and 54 of the WA, and sections 75 and 85 of EPEA to transfer the following licence and approvals for the Muskeg River mine to Canadian Natural Upgrading Limited for OSCA scheme approval 8512G, WA licence 0071821-01-00, WA approval 0071828-00-00, and EPEA approval 20809-01-00. Shell has also applied to transfer the financial security program submission for the Muskeg River mine. Shell's Muskeg River mine is located about 70 kilometres north of Fort McMurray, Alberta, within Townships 94 and 95; Ranges 8, 9, and 10; West of the 4th Meridian, in the Regional Municipality of Wood Buffalo. The deadline for submitting a statement of concern is May 29, 2017 in the following locations:

00-094-09W4M
00-095-09W4M
00-094-10W4M
23-095-10W4M
00-094-11W4M
00-095-11W4M

 

00153125-018 - Shell Canada Limited
Approved

Shell Canada Limited has requested that the expiry date of the approval for the Jackpine Oil Sands Mine be extended to allow for all parties to complete their review of the renewal application in the following locations:

15-095-08W4M
16-095-08W4M
17-095-08W4M
18-095-08W4M
19-095-08W4M
20-095-08W4M
21-095-08W4M
22-095-08W4M
28-095-08W4M
29-095-08W4M
30-095-08W4M
31-095-08W4M
00-095-09W4M
01-095-09W4M
02-095-09W4M
03-095-09W4M
04-095-09W4M
05-095-09W4M
08-095-09W4M
09-095-09W4M
10-095-09W4M
11-095-09W4M
12-095-09W4M
13-095-09W4M
14-095-09W4M
15-095-09W4M
16-095-09W4M
17-095-09W4M
19-095-09W4M
20-095-09W4M
21-095-09W4M
22-095-09W4M
23-095-09W4M
24-095-09W4M
25-095-09W4M
26-095-09W4M
27-095-09W4M
28-095-09W4M
29-095-09W4M
30-095-09W4M
32-095-09W4M
33-095-09W4M
34-095-09W4M
35-095-09W4M
36-095-09W4M
00-095-10W4M
00-095-11W4M

 

00153125-019 - Shell Canada Limited
Approved

Shell has applied under section 13 of OSCA, sections 80 and 54 of the WA, and sections 75 and 85 of EPEA to transfer the following licences and approvals for its Jackpine mine to Canadian Natural Upgrading Limited containing OSCA scheme approval 9756E, OSCA Phase 1 Pleistocene Channel Aquifer (PCA) Mine Plan approval, WA licence 00186157-00-00, WA Approval 00205433-00-00, and EPEA approval 153125-00-00. Shell has also applied to transfer WA application 001-00329252 for a licence and WA application 001-00329253 for an approval, as well as the financial security program submission for the mine. Shell's Jackpine mine is located about 70 kilometres north of Fort McMurray, Alberta, within Townships 95, 96, and 97; Ranges 8 and 9; West of the 4th Meridian, in the Regional Municipality of Wood Buffalo. Deadline for submitting a statement of concern is May 29, 2017 in the following locations:

15-095-08W4M
16-095-08W4M
17-095-08W4M
18-095-08W4M
19-095-08W4M
20-095-08W4M
21-095-08W4M
22-095-08W4M
28-095-08W4M
29-095-08W4M
30-095-08W4M
31-095-08W4M
00-095-09W4M
01-095-09W4M
02-095-09W4M
03-095-09W4M
04-095-09W4M
05-095-09W4M
08-095-09W4M
09-095-09W4M
10-095-09W4M
11-095-09W4M
12-095-09W4M
13-095-09W4M
14-095-09W4M
15-095-09W4M
16-095-09W4M
17-095-09W4M
19-095-09W4M
20-095-09W4M
21-095-09W4M
22-095-09W4M
23-095-09W4M
24-095-09W4M
25-095-09W4M
26-095-09W4M
27-095-09W4M
28-095-09W4M
29-095-09W4M
30-095-09W4M
32-095-09W4M
33-095-09W4M
34-095-09W4M
35-095-09W4M
36-095-09W4M
00-095-10W4M
00-095-11W4M

 

00388947-004 - Shell Canada Limited
Approved

Shell Canada Limited has submitted an amendment application under the Environmental Protection and Enhancement Act for an Authorization to use treated final effluent from The Town of Fox Creek's municipal wastewater lagoon for the purpose of hydraulic fracturing. The amendment is to add the FC 23ext point of use in LSD 15 of Section 7 Township 63 Rge 19 West of the 5th Meridian in the following locations:

33-062-19W5M
07-063-19W5M
14-063-20W5M
21-063-20W5M
27-063-20W5M
33-063-20W5M
05-064-20W5M
10-064-20W5M

 

00001642-032 - Shell Canada Limited
Approved

Shell Canada Limited has submitted an application for an amendment under the Specified Enactments (Environmental Protection and Enhancement Act) for their Peace River In-Situ project to remove all three natural gas turbines from their current approval, as they will no longer be constructed, or owned/operated by Shell Canada Limited. The Project is located approximately 40 kilometres northeast of the town of Peace River. Deadline for submission of Statements of Concern is June 16, 2017 in the following locations:

19-084-17W5M
30-084-17W5M
31-084-17W5M
06-085-17W5M
07-085-17W5M
25-084-18W5M
30-084-18W5M
31-084-18W5M
34-084-18W5M
35-084-18W5M
36-084-18W5M
01-085-18W5M
02-085-18W5M
03-085-18W5M
04-085-18W5M
05-085-18W5M
06-085-18W5M
07-085-18W5M
08-085-18W5M
09-085-18W5M
10-085-18W5M
11-085-18W5M
12-085-18W5M
13-085-18W5M
14-085-18W5M
15-085-18W5M
16-085-18W5M
17-085-18W5M
18-085-18W5M
19-085-18W5M
20-085-18W5M
21-085-18W5M
22-085-18W5M
23-085-18W5M
24-085-18W5M
25-085-18W5M
26-085-18W5M
27-085-18W5M
28-085-18W5M
29-085-18W5M
30-085-18W5M
31-085-18W5M
36-085-18W5M
06-086-18W5M
01-085-19W5M
11-085-19W5M
12-085-19W5M
13-085-19W5M
14-085-19W5M
23-085-19W5M
24-085-19W5M
36-085-19W5M
01-086-19W5M
11-086-19W5M
12-086-19W5M

 

00001642-033 - Shell Canada Limited
Approved

Shell Canada Limited has submitted an application under the Specified Enactments (Environmental Protection and Enhancement Act) for an amendment to an existing approval to change approval holder name from Shell Canada Limited to Canadian Natural Upgrading Limited. The approval pertains to the Peace River In Situ Project. The Project is located approximately 40 kilometres northeast of the town of Peace River. Deadline for submission of Statements of Concern is June 16, 2017 in the following locations:

19-084-17W5M
30-084-17W5M
31-084-17W5M
06-085-17W5M
07-085-17W5M
25-084-18W5M
30-084-18W5M
31-084-18W5M
34-084-18W5M
35-084-18W5M
36-084-18W5M
01-085-18W5M
02-085-18W5M
03-085-18W5M
04-085-18W5M
05-085-18W5M
06-085-18W5M
07-085-18W5M
08-085-18W5M
09-085-18W5M
10-085-18W5M
11-085-18W5M
12-085-18W5M
13-085-18W5M
14-085-18W5M
15-085-18W5M
16-085-18W5M
17-085-18W5M
18-085-18W5M
19-085-18W5M
20-085-18W5M
21-085-18W5M
22-085-18W5M
23-085-18W5M
24-085-18W5M
25-085-18W5M
26-085-18W5M
27-085-18W5M
28-085-18W5M
29-085-18W5M
30-085-18W5M
31-085-18W5M
36-085-18W5M
06-086-18W5M
01-085-19W5M
11-085-19W5M
12-085-19W5M
13-085-19W5M
14-085-19W5M
23-085-19W5M
24-085-19W5M
36-085-19W5M
01-086-19W5M
11-086-19W5M
12-086-19W5M