00141258-009 - Osum Production Corp.
Approved

OSUM Production Corp. has submitted an application under the Environmental Protection and Enhancement Act for an amendment to an existing approval for the Orion Oil Sands Project. The amendment is to increase the NOx emission limits reflective of the enhanced boiler capability due to a retrofit of the burner spuds. The deadline for submitting a statement of concern is July 6, 2018 in the following locations:

15-063-03W4M
16-063-03W4M
17-063-03W4M
08-064-03W4M
09-064-03W4M
10-064-03W4M
11-064-03W4M
12-064-03W4M
14-064-03W4M
15-064-03W4M
16-064-03W4M
17-064-03W4M

 

00141258-006 - Osum Production Corp.
Approved

OSUM Production Corp. has submitted an application under the Environmental Protection and Enhancement Act for an amendment to an existing approval to to raise the limit for SO2 emissions from current approved limit of less than 0.9 tonnes/day to 1.61 tonnes/day. This increase is due to increased production at the Orion facility to within approved production capacity of 10,000 bbd in the following locations:

15-063-03W4M
16-063-03W4M
17-063-03W4M
08-064-03W4M
09-064-03W4M
10-064-03W4M
11-064-03W4M
12-064-03W4M
14-064-03W4M
15-064-03W4M
16-064-03W4M
17-064-03W4M

 

00141258-007 - Osum Production Corp.
Approved

Amend or renew a previously granted EPEA approval in the following locations:

15-063-03W4M
16-063-03W4M
17-063-03W4M
08-064-03W4M
09-064-03W4M
10-064-03W4M
11-064-03W4M
12-064-03W4M
14-064-03W4M
15-064-03W4M
16-064-03W4M
17-064-03W4M

 

00141258-005 - Osum Production Corp.
Approved

Osum Production Corp. has submitted an application under the Environmental Protection and Enhancement for a renewal of an existing approval for the continued operation of the Orion Oil Sands Project. The central processing facility is located in the NW 1/4 of Section 16 Township 64 Range 3 West of the 4th Meridian (approximately 17 km northwest of Cold Lake) and the project footprint includes the N 1/2 of Section 9, N 1/2 of Section 10, N 1/2 of Section 15, N 1/2 of Section 16 and N 1/2 of Section 17 Township 64 Range 3 West of the 4th Meridian. The processing facility is licenced to produce bitumen up to a rate of 3,180 m3/d (20,000 barrels per day; bpd). The deadline for submitting a statement of concern is June 4, 2015 in the following locations:

15-063-03W4M
16-063-03W4M
17-063-03W4M
08-064-03W4M
09-064-03W4M
10-064-03W4M
11-064-03W4M
12-064-03W4M
14-064-03W4M
15-064-03W4M
16-064-03W4M
17-064-03W4M

 

00141258-008 - Osum Production Corp.
Withdrawn

OSUM Production Corp. has applied for an amendment of their existing Environmental Protection and Enhancement Act approval of the Hilda Lake Experimental SAGD Project. The amendment is requested to include the addition of a continuous emissions monitoring system (CEMS). Deadline for submission of statements of concern is December 17, 2015 in the following locations:

15-063-03W4M
16-063-03W4M
17-063-03W4M
08-064-03W4M
09-064-03W4M
10-064-03W4M
11-064-03W4M
12-064-03W4M
14-064-03W4M
15-064-03W4M
16-064-03W4M
17-064-03W4M