Location

Sec.
-
Twp.
-
Rge.
-
Mer.
-
Select a
Meridian
(Mer.) first

Meridian

W4M11
 

Results : 1 - 10 of 11

00216466-010 - MEG Energy Corp.
Approved

MEG Energy Corp. has submitted an amendment application under the Environmental Protection and Enhancement Act to expand the experimental scheme to test a propane recycle system and to include additional well pairs and infill wells within pattern AP. The deadline for submission of Statements of Concern is September 24, 2017 in the following locations:

20-076-04W4M
29-076-04W4M
05-077-04W4M
19-077-04W4M
20-077-04W4M
29-077-04W4M
30-077-04W4M
03-077-05W4M
04-077-05W4M
09-077-05W4M
12-077-05W4M
14-077-05W4M
15-077-05W4M
16-077-05W4M
17-077-05W4M
18-077-05W4M
19-077-05W4M
20-077-05W4M
21-077-05W4M
23-077-05W4M
24-077-05W4M
28-077-05W4M
29-077-05W4M
20-081-05W4M
18-082-05W4M
12-077-06W4M
13-077-06W4M
22-077-06W4M
24-077-06W4M
32-077-06W4M
33-077-06W4M
34-075-08W4M
35-075-08W4M
10-076-08W4M
14-075-11W4M
24-076-11W4M
34-076-11W4M
10-075-12W4M
26-077-13W4M
05-078-13W4M

 

00216466-011 - MEG Energy Corp.
Approved

MEG Energy Corporation has applied under the Oil Sands Conservation Act and the Environmental Protection and Enhancement Act to complete facility modifications at the central processing facility (located at 02-16-077-05W4M), including the addition of process equipment and changes to the processes of the facility, in order to recycle excess produced gas back to the field for usage at pad sites in the following locations:

20-076-04W4M
29-076-04W4M
05-077-04W4M
19-077-04W4M
20-077-04W4M
29-077-04W4M
30-077-04W4M
03-077-05W4M
04-077-05W4M
09-077-05W4M
12-077-05W4M
14-077-05W4M
15-077-05W4M
16-077-05W4M
17-077-05W4M
18-077-05W4M
19-077-05W4M
20-077-05W4M
21-077-05W4M
23-077-05W4M
24-077-05W4M
28-077-05W4M
29-077-05W4M
20-081-05W4M
18-082-05W4M
12-077-06W4M
13-077-06W4M
22-077-06W4M
24-077-06W4M
32-077-06W4M
33-077-06W4M
34-075-08W4M
35-075-08W4M
10-076-08W4M
14-075-11W4M
24-076-11W4M
34-076-11W4M
10-075-12W4M
26-077-13W4M
05-078-13W4M

 

00226425-006 - MEG Energy Corp.
Approved

An application has been submitted for a consent to transfer the existing Environmental Protection and Enhancement Act approval of the Stonefell Terminal Project from MEG Energy Corp. to Access Pipeline Inc. The deadline for submission of Statements of Concern is May 9, 2018 in the following locations:

08-056-21W4M
09-056-21W4M
12-056-21W4M

 

00216466-012 - MEG Energy Corp.
Approved

MEG Energy Corp. has submitted an application for an amendment under Environmental Protection and Enhancement Act to an existing approval for Christina Lake Regional Project to change the monitoring requirement for Phase 2B to a single CEMS unit to be installed on either of the two 87.2 MW drum boilers. Deadline for submitting a Statement of Concern is June 2, 2018 in the following locations:

20-076-04W4M
29-076-04W4M
05-077-04W4M
19-077-04W4M
20-077-04W4M
29-077-04W4M
30-077-04W4M
03-077-05W4M
04-077-05W4M
09-077-05W4M
12-077-05W4M
14-077-05W4M
15-077-05W4M
16-077-05W4M
17-077-05W4M
18-077-05W4M
19-077-05W4M
20-077-05W4M
21-077-05W4M
23-077-05W4M
24-077-05W4M
28-077-05W4M
29-077-05W4M
20-081-05W4M
18-082-05W4M
12-077-06W4M
13-077-06W4M
22-077-06W4M
24-077-06W4M
32-077-06W4M
33-077-06W4M
34-075-08W4M
35-075-08W4M
10-076-08W4M
14-075-11W4M
24-076-11W4M
34-076-11W4M
10-075-12W4M
26-077-13W4M
05-078-13W4M

 

00216466-007 - MEG Energy Corp.
Approved

MEG Energy Corp. is proposing equipment relocation and integration at the Christina Lake Regional Project (CLRP). MEG proposes to relocate a portion of the equipment and facilities previously approved as part of the Phase 3 facility to the existing plant site disposition immediately adjacent to the operating Phase 2B Central Processing Facility (CPF) located in the S 1/2 of Section 16 Township 77 Range 5 West of the 4th Meridian (in the Christina Lake area). The move will facilitate integration with existing infrastructure. These facilities are being referred to as CLRP Phase 2B4X in the following locations:

20-076-04W4M
29-076-04W4M
05-077-04W4M
19-077-04W4M
20-077-04W4M
29-077-04W4M
30-077-04W4M
03-077-05W4M
04-077-05W4M
09-077-05W4M
12-077-05W4M
14-077-05W4M
15-077-05W4M
16-077-05W4M
17-077-05W4M
18-077-05W4M
19-077-05W4M
20-077-05W4M
21-077-05W4M
23-077-05W4M
24-077-05W4M
28-077-05W4M
29-077-05W4M
20-081-05W4M
18-082-05W4M
12-077-06W4M
13-077-06W4M
22-077-06W4M
24-077-06W4M
32-077-06W4M
33-077-06W4M
34-075-08W4M
35-075-08W4M
10-076-08W4M
14-075-11W4M
24-076-11W4M
34-076-11W4M
10-075-12W4M
26-077-13W4M
05-078-13W4M

 

00216466-008 - MEG Energy Corp.
Approved

MEG Energy Corp. has submitted an application under the Environmental Protection and Enhancement Act for an amendment to an existing approval to reduce the previously approved NOX emission limits for steam generation equipment at Phase 2B and 2B4X of the Christina Lake Regional Project. The two drum boilers will have a revised limit of 8.2 kg/hr and the 4 generators will have a revised limit of 5.6 kg/hr. These two changes result in a net decrease of 7.4 kg/h of total NOx emissions at the facility. The deadline for filing a statement of concern is February 26, 2015 in the following locations:

20-076-04W4M
29-076-04W4M
05-077-04W4M
19-077-04W4M
20-077-04W4M
29-077-04W4M
30-077-04W4M
03-077-05W4M
04-077-05W4M
09-077-05W4M
12-077-05W4M
14-077-05W4M
15-077-05W4M
16-077-05W4M
17-077-05W4M
18-077-05W4M
19-077-05W4M
20-077-05W4M
21-077-05W4M
23-077-05W4M
24-077-05W4M
28-077-05W4M
29-077-05W4M
20-081-05W4M
18-082-05W4M
12-077-06W4M
13-077-06W4M
22-077-06W4M
24-077-06W4M
32-077-06W4M
33-077-06W4M
34-075-08W4M
35-075-08W4M
10-076-08W4M
14-075-11W4M
24-076-11W4M
34-076-11W4M
10-075-12W4M
26-077-13W4M
05-078-13W4M

 

00353119-001 - MEG Energy Corp.
Withdrawn

MEG Energy Corp. (MEG) has been issued an authorization for the construction, operation and reclamation of a Diluent Removal Facility along with associated storage facilities located in the Alberta Industrial Heartland region northeast of Edmonton and east of Bruderheim. It will be located adjacent to MEG's approved HI-Q® Field Demonstration Pilot Project within existing industrial lands (EPEA Approval No. 324574-00-00). As such, the Project will share certain facilities with the HI-Q® Project including a stormwater pond, flare, and operations building. The project is designed with a daily inlet capacity of 30,000 barrels of diluted bitumen and will consist of a single processing train and associated storage tanks. It is expected to have a lifespan of 20 years and would be operational in 2017 in the following location:

34-055-20W4M

 

00324574-002 - MEG Energy Corp.
Approved

MEG Energy Corp. (MEG) has applied for an authorization under the Environmental Protection and Enhancement Act for the construction, operation and reclamation of a Diluent Removal Facility along with associated storage facilities located in the Alberta Industrial Heartland region northeast of Edmonton and east of Bruderheim. It will be located within the footprint of MEG's approved HI-Q® Field Demonstration Pilot Project within existing industrial lands (EPEA Approval No. 324574-00-00). As such, the Project will share certain facilities with the HI-Q® Project including a stormwater pond, flare, and operations building. The project is designed with a daily inlet capacity of 30,000 barrels of diluted bitumen and will consist of a single processing train and associated storage tanks. It is expected to have a lifespan of 20 years and would be operational in 2017. This notice was previously posted under Application No. 001-353119. The deadline for filing a statement of concern is April 8, in the following location:

34-055-20W4M

 

00226425-005 - MEG Energy Corp.
Approved

MEG Energy Corp. has submitted an application under the Environmental Protection and Enhancement Act for renewal of their existing approval for the Stonefell Terminal Project. The Terminal is a bulk petroleum storage facility intended to store greater than 10,000 m3 of petroleum products. Deadline for submission of statements of concern is April 1, 2016 in the following locations:

08-056-21W4M
09-056-21W4M
12-056-21W4M

 

00364483-001 - MEG Energy Corp.
Approved

MEG Energy Corp. has submitted an application under the Environmental Protection and Enhancement Act for approval to construct, operate and reclaim a diluent removal facility (bulk petroleum storage facility). The facility will be located in the N 1/2 and SW 1/4 of Section 26 and the SW 1/4 of Section 35 Township 55 Range 21 West of the 4th Meridian (west of Bruderheim) and is designed with a daily inlet capacity of 90,000 barrels of diluted bitumen per day (bbl/d) and will consist of three 30,000 bbl/d phases, associated storage tanks, and a rail loading facility. The deadline for filing a statement of concern is March 11, 2015 in the following locations:

26-055-21W4M
35-055-21W4M