Results : 1 - 8 of 8

00252529-005 - Birchcliff Energy Ltd.
Approved

Application for an amendmnet to an existing approval to construct and operate an additional 2647 kW compressor at the Pouce Coupe Sour Gas Plant located in LSD 3 of Section 22 Township 78 Range 12 West of the 6th Meridian (approximately 16 km south of Bonanza). The capacity of the plant is 4,239 x 10^3 m^3/d in the following location:

22-078-12W6M

 

00075636-011 - Birchcliff Energy Ltd.
Approved

Amend or renew a previously granted EPEA approval in the following location:

21-087-09W6M

 

00252529-006 - Birchcliff Energy Ltd.
Approved

Birchcliff Energy Ltd. has submitted an application under the Environmental Protection and Enhancement Act for an amendment to an existing approval for the expansion of the Pouce Coupe Sour Gas Plant. The facility is located in LSD 3 of Section 22 Township 78 Range 12 West of the 6th Meridian (approximately 16 km south of Bonanza in the Pouce Coupe area) and the expansion will consist of the installation of an additional gas processing train capable of processing 3398 x 10^3 m^3/d, which bring the total plant capacity to 8495 x 10^3m^3/d from 5086.8 x 10^3m^3/d. The deadline for submitting a statement of concern will be February 7, 2015 in the following location:

22-078-12W6M

 

00252529-007 - Birchcliff Energy Ltd.
Approved

Birchcliff Energy Ltd. has submitted an amendment application under the Environmental Protection and Enhancement Act for their existing approval of the Pouce Coupe Sour Gas Plant. The amendment is for the construction of a source water pond. The deadline for submission of Statements of Concern is July 26, 2016 in the following location:

22-078-12W6M

 

00075636-012 - Birchcliff Energy Ltd.
Approved

Birchcliff Energy Ltd. has submitted an application under Specified Enactments (Environmental Protection and Enhancement Act) for an amendment to an existing approval for the Worsley Sour Gas Plant. The plant has been sold to Enercapita Energy Ltd. and a transfer of the approval is required. The deadline for submitting a statement of concern is December 15, 2017 in the following location:

21-087-09W6M

 

00252529-008 - Birchcliff Energy Ltd.
Approved

Birchcliff Energy Ltd. has submitted an application under the Environmental Protection and Enhancement Act for a renewal of their existing approval of the Pouce Coupe Sour Gas Plant. The deadline for submission of Statements of Concern is November 29, 2018 in the following location:

22-078-12W6M

 

00151821-005 - Birchcliff Energy Ltd.
Approved

Birchcliff Energy Ltd. has submitted an application under the Environmental Protection and Enhancement Act for an amendment to an existing approval to decommission and reclaim the Rycroft Sour Gas Plant. The plant is located in LSD 7 of Section 2 Township 77 Range 4 West of the 6th Meridian (approximately 70 km north of Grande Prairie) and operated as a sweet gas plant but has been shut in since May, 2011 in the following location:

02-077-04W6M

 

00252529-009 - Birchcliff Energy Ltd.
Approved

Birchcliff Energy Ltd. has submitted an application under the Environmental Protection and Enhancement Act for an amendment to their existing approval of the Pouce Coupe Sour Gas Plant. The amendment is to propose changes which will centralize the initial receiving of inlet gas and liquids at the facility into a common 2-phase separator and add new equipment to increase the liquids handling capacity of the plant. New equipment includes a slug catcher, an inlet liquids heater, a condensate/water separator, a tank farm, a pump skid, a liquids stabilizer, a vapor recovery package, and a recycle compressor. The deadline for submission of Statements of Concern is August 31, 2019 in the following location:

22-078-12W6M