Location

Sec.
-
Twp.
-
Rge.
-
Mer.
-
Select a
Meridian
(Mer.) first

Meridian

W4M4
 

Results : 1 - 4 of 4

00305444-002 - Access Pipeline Inc.
Approved

Access Pipeline Inc. has applied for an amendment of their Environmental Protection and Enhancement Act approval of the Northeast Expansion Pipeline Project. The amendment is to request an extension to the expiry date of their existing approval in the following locations:

00-076-05W4M
00-077-05W4M
16-077-05W4M
00-074-06W4M
07-074-06W4M
00-075-06W4M
28-075-06W4M
00-076-06W4M
11-076-06W4M
00-073-07W4M
00-074-07W4M
00-073-08W4M
00-072-09W4M
00-073-09W4M
26-073-09W4M
34-073-09W4M
00-071-10W4M
00-072-10W4M
14-072-10W4M
00-069-11W4M
00-070-11W4M
28-070-11W4M
00-071-11W4M
05-067-12W4M
06-067-12W4M
08-067-12W4M
17-067-12W4M
20-067-12W4M
29-067-12W4M
31-067-12W4M
32-067-12W4M
06-068-12W4M
07-068-12W4M
17-068-12W4M
18-068-12W4M
20-068-12W4M
28-068-12W4M
29-068-12W4M
33-068-12W4M
00-069-12W4M
30-066-13W4M
31-066-13W4M
32-066-13W4M
01-067-13W4M
02-067-13W4M
03-067-13W4M
04-067-13W4M
24-068-13W4M
18-065-14W4M
19-065-14W4M
20-065-14W4M
28-065-14W4M
29-065-14W4M
33-065-14W4M
34-065-14W4M
03-066-14W4M
10-066-14W4M
11-066-14W4M
14-066-14W4M
23-066-14W4M
25-066-14W4M
26-066-14W4M
03-065-15W4M
04-065-15W4M
05-065-15W4M
06-065-15W4M
10-065-15W4M
11-065-15W4M
13-065-15W4M
14-065-15W4M
18-063-16W4M
19-063-16W4M
30-063-16W4M
31-063-16W4M
32-063-16W4M
05-064-16W4M
08-064-16W4M
09-064-16W4M
16-064-16W4M
21-064-16W4M
22-064-16W4M
26-064-16W4M
27-064-16W4M
35-064-16W4M
36-064-16W4M
01-065-16W4M
18-062-17W4M
19-062-17W4M
20-062-17W4M
29-062-17W4M
32-062-17W4M
33-062-17W4M
02-063-17W4M
03-063-17W4M
11-063-17W4M
12-063-17W4M
13-063-17W4M
06-061-18W4M
07-061-18W4M
17-061-18W4M
18-061-18W4M
20-061-18W4M
21-061-18W4M
27-061-18W4M
28-061-18W4M
34-061-18W4M
35-061-18W4M
02-062-18W4M
11-062-18W4M
12-062-18W4M
13-062-18W4M
19-059-19W4M
30-059-19W4M
31-059-19W4M
32-059-19W4M
04-060-19W4M
05-060-19W4M
09-060-19W4M
15-060-19W4M
16-060-19W4M
22-060-19W4M
26-060-19W4M
27-060-19W4M
35-060-19W4M
36-060-19W4M
01-061-19W4M
11-061-19W4M
18-058-20W4M
19-058-20W4M
20-058-20W4M
29-058-20W4M
32-058-20W4M
33-058-20W4M
03-059-20W4M
10-059-20W4M
11-059-20W4M
13-059-20W4M
14-059-20W4M
24-059-20W4M
18-056-21W4M
19-056-21W4M
29-056-21W4M
30-056-21W4M
32-056-21W4M
36-056-21W4M
05-057-21W4M
08-057-21W4M
17-057-21W4M
20-057-21W4M
27-057-21W4M
28-057-21W4M
29-057-21W4M
34-057-21W4M
35-057-21W4M
36-057-21W4M
01-058-21W4M
12-058-21W4M
13-058-21W4M
24-056-22W4M
24-057-22W4M

 

00240294-002 - Access Pipeline Inc.
Approved

Access Pipeline Inc. has submitted an application under the Specified Enactments (Environmental Protection and Enhancement Act) for renewal of an existing approval for the construction, operation, and reclamation of the Sturgeon Terminal; a refined bulk petroleum storage facility located 14 km south of Redwater, Alberta. The deadline for submission of Statements of Concern is September 30, 2017 in the following locations:

08-056-21W4M
18-056-21W4M

 

00353436-001 - Access Pipeline Inc.
Withdrawn

Access Pipeline Inc. (API) is applying to the Alberta Energy Regulator (AER) for Conservation and Reclamation (C&R) Approval for the API Southwest Expansion (SWX) Project (the Project); a 1,067 milometer (mm) (NPS 42¿) pipeline to be constructed near Fort Saskatchewan, Alberta. The approximately 50 km route for the Project will run from the Sturgeon Terminal SW-18-25-21-W4M to the Edmonton Terminal at SE-5-53-23-W4M, with the majority of the proposed route paralleling an existing API pipeline. Clearing and construction for the SWX right-of-way (RoW) is scheduled for November 2015, with an anticipated completion date to occur in the summer of 2016 and be operating by January 1, 2017. The pipeline will carry a bitumen blend with an initial nominal capacity of 1,393,000 barrels per day (bpd) and a potentially fully expanded nominal capacity of 1,639,000 bpd in the following locations:

06-055-21W4M
07-055-21W4M
18-055-21W4M
19-055-21W4M
20-055-21W4M
28-055-21W4M
29-055-21W4M
33-055-21W4M
04-056-21W4M
08-056-21W4M
09-056-21W4M
17-056-21W4M
18-056-21W4M
31-053-22W4M
05-054-22W4M
06-054-22W4M
09-054-22W4M
13-054-22W4M
14-054-22W4M
15-054-22W4M
16-054-22W4M
24-054-22W4M
25-054-22W4M
36-054-22W4M
04-053-23W4M
05-053-23W4M
09-053-23W4M
16-053-23W4M
21-053-23W4M
22-053-23W4M
26-053-23W4M
27-053-23W4M
35-053-23W4M
36-053-23W4M

 

00385187-001 - Access Pipeline Inc.
Withdrawn

Access Pipeline Inc. has applied for an approval under the Environmental Protection and Enhancement Act for the Sturgeon to Heartland Pipeline Project to be constructed northeast of Fort Saskatchewan, Alberta. The proposed Project will involve the construction and operation of a pipeline to transport a bitumen blend from the ACCESS Sturgeon Terminal at SW 18-56-21 W4M to a tie-in location at NW 28-55-21 W4M near the Heartland Terminal. Subject to regulatory approval, clearing and other pre-construction activities along the right-of-way are scheduled to begin in late Q4 2016 and the proposed Project is expected to be ready for service by Q1 2017. Deadline for submission of Statements of Concern is October 27, 2016 in the following locations:

28-055-21W4M
18-056-21W4M