Company

Decision Type

Location

Sec.
-
Twp.
-
Rge.
-
Mer.
-
Select a
Meridian
(Mer.) first

Meridian

W4M137 W5M72 W6M41
 

Results : 1 - 10 of 253

00011406-008 - Cleo Energy Corp.
Approved

CLEO Energy Corp. has submitted an application under the Environmental Protection and Enhancement Act for a renewal of an existing approval for the continuation of the reclamation of the Amisk Sour Gas Plant located in LSD 1 of Section 22 Township 41 Range 8 West of the 4th Meridian (approximately 3 km southeast of Hardisty). A pipeline riser remains in operation in the northeast corner of the site. Reclamation will be required upon the decommissioning and abandonment of the pipeline. Reclamation work required to be completed includes recontouring the lease, decompaction, topsoil replacement and revegetation. Until the pipeline is abandoned, annual vegetation control will be required on the plant site. The deadline for submitting a statement of concern is October 14, 2018 in the following location:

22-041-08W4M

 

00253356-004 - Enbridge Pipelines (Athabasca) Inc.
Approved

Enbridge Pipelines (Athabasca) Inc. has submitted an application under the Environmental Protection and Enhancement Act for the renewal of an existing approval for the Sunday Creek Terminal Bulk Petroleum Storage Facility located in the E 1/2 of Section 8 and NW 1/4 of Section 9 Township 76 Range 6 West of the 4th Meridian (approximately 130 km south of Fort McMurray). The facility receives blended product (bitumen and Diluent) from the Cenovus Foster Creek Christian Lake steam-assisted gravity drainage facility. Blended product is batched and pumped via pipeline to Enbridge's existing Kirby Lake Terminal in the following locations:

08-076-06W4M
09-076-06W4M

 

00001815-013 - Cardinal Energy Ltd.
Approved

Cardinal Energy Ltd. has submitted an application under the Environmental Protection and Enhancement Act for an extension of expiry date of an existing approval for the Mitsue Sour Gas Plant. The extension will allow Cardinal Energy Ltd. time to evaluate the newly installed acid gas flare and resolve any potential operational issues that arise prior to submitting a renewal application in the following location:

30-072-04W5M

 

00046972-021 - CARDINAL RIVER COALS LTD
Approved

Cardinal River Coals Ltd has submitted an amendment application under the Environmental Protection and Enhancement Act for the Harris Phase 10 Pit extension. Deadline for submission of Statments of Concern in November 24, 2018 in the following locations:

23-045-22W5M
24-045-22W5M
26-045-22W5M
27-045-22W5M
28-045-22W5M
31-045-22W5M
32-045-22W5M
33-045-22W5M
34-045-22W5M
04-046-22W5M
05-046-22W5M
06-046-22W5M
07-046-22W5M
04-045-23W5M
27-045-23W5M
28-045-23W5M
29-045-23W5M
31-045-23W5M
32-045-23W5M
33-045-23W5M
34-045-23W5M
35-045-23W5M
36-045-23W5M
01-046-23W5M
02-046-23W5M
03-046-23W5M
04-046-23W5M
05-046-23W5M
06-046-23W5M
07-046-23W5M
08-046-23W5M
09-046-23W5M
10-046-23W5M
18-046-23W5M
19-046-23W5M
30-046-23W5M
31-046-23W5M
00-047-23W5M
36-045-24W5M
01-046-24W5M
02-046-24W5M
11-046-24W5M
12-046-24W5M
24-046-24W5M
36-046-24W5M
12-047-24W5M

 

00009725-014 - Canlin Energy Corporation
Approved

Canlin Energy Corporation has submitted an application under the Environmental Protection and Enhancement Act to transfer the ownership of the Wood River Sour Gas Plant from Canlin Energy Corporation to Trident Exploration (Alberta) Corp. Deadline for submission of Statements of Concern is November 21, 2018 in the following location:

28-043-23W4M

 

00262409-004 - Pengrowth Energy Corporation
Approved

Pengrowth Energy Corporation has submitted an application under the Environmental Protection and Enhancement Act to transfer the Hanna Sweet Gas Plant registration to AlphaBow Energy Ltd. The associated facility licence was transferred to AlphaBow Energy on December 6, 2017 in the following location:

01-031-14W4M

 

00000094-078 - Suncor Energy Inc.
Approved

Suncor Energy Inc. has submitted an application under the Environmental Protection and Enhancement Act for an amendment of their existing approval of the Fort McMurray Oil Sands Plant. The amendment is for a modification to the base plant industrial wastewater system. The deadline for submission of Statements of Concern is June 29, 2018 in the following locations:

00-091-08W4M
03-091-08W4M
04-091-08W4M
05-091-08W4M
08-091-08W4M
09-091-08W4M
10-091-08W4M
15-091-08W4M
16-091-08W4M
17-091-08W4M
20-091-08W4M
21-091-08W4M
22-091-08W4M
28-091-08W4M
30-091-08W4M
31-091-08W4M
06-092-08W4M
07-092-08W4M
19-092-08W4M
20-092-08W4M
29-092-08W4M
30-092-08W4M
31-092-08W4M
34-090-09W4M
35-090-09W4M
01-091-09W4M
02-091-09W4M
03-091-09W4M
10-091-09W4M
11-091-09W4M
12-091-09W4M
13-091-09W4M
14-091-09W4M
15-091-09W4M
16-091-09W4M
21-091-09W4M
22-091-09W4M
23-091-09W4M
24-091-09W4M
25-091-09W4M
26-091-09W4M
27-091-09W4M
28-091-09W4M
29-091-09W4M
32-091-09W4M
33-091-09W4M
34-091-09W4M
35-091-09W4M
36-091-09W4M
01-092-09W4M
02-092-09W4M
03-092-09W4M
04-092-09W4M
05-092-09W4M
08-092-09W4M
09-092-09W4M
10-092-09W4M
11-092-09W4M
12-092-09W4M
14-092-09W4M
15-092-09W4M
16-092-09W4M
17-092-09W4M
19-092-09W4M
20-092-09W4M
30-092-09W4M
13-090-10W4M
03-091-10W4M
04-091-10W4M
05-091-10W4M
06-091-10W4M
07-091-10W4M
08-091-10W4M
09-091-10W4M
10-091-10W4M
11-091-10W4M
12-091-10W4M
13-091-10W4M
14-091-10W4M
15-091-10W4M
16-091-10W4M
01-092-10W4M
02-092-10W4M
03-092-10W4M
04-092-10W4M
05-092-10W4M
06-092-10W4M
07-092-10W4M
12-092-10W4M
13-092-10W4M
23-092-10W4M
24-092-10W4M
25-092-10W4M
26-092-10W4M
34-092-10W4M
04-093-10W4M
15-090-11W4M
16-090-11W4M
01-091-11W4M
02-091-11W4M
03-091-11W4M
06-091-11W4M
07-091-11W4M
08-091-11W4M
09-091-11W4M
10-091-11W4M
11-091-11W4M
12-091-11W4M
13-091-11W4M
14-091-11W4M
15-091-11W4M
16-091-11W4M
01-092-11W4M
02-092-11W4M
03-092-11W4M
06-092-11W4M
07-092-11W4M
08-092-11W4M
09-092-11W4M

 

00010158-012 - Paramount Resources (ACL) Ltd.
Approved

Apache Canada Ltd. has requested a renewal of their existing approval under Environmental Protection and Enhancement Act for North Caroline Sour Gas Plant. Deadline for submitting a Statement of Concern is July 2, 2017 in the following location:

11-035-06W5M

 

00019443-021 - Husky Oil Operations Limited
Approved

Husky Oil Operations Limited has submitted an application under the Environmental Protection and Enhancement Act for an amendment to an existing approval to construct 4 above ground storage tanks at their Hardisty Bulk Petroleum Storage Facility. With the addition of the four proposed tanks, the total on-site storage capacity will be 1,041,200 m^3. The construction of these storage tanks will not involve additional surface disturbance. The deadline for submitting a statement of concern is October 26, 2018 in the following locations:

19-042-09W4M
29-042-09W4M

 

00385805-002 - Encana Corporation
Approved

Encana Corporation has submitted an application under the Environmental Protection and Enhancement Act to cancel the approval for the Simonette Thermal Electric Power Plant as the plant is no longer required in the following location:

31-062-24W5M