00000057-021 - Tidewater Midstream and Infrastructure Ltd.
Approved

Tidewater Midstream and Infrastructure Ltd. has requested an amendment to Ram River Sour Gas Plant approval under Environmental Protection and Enhancement Act to add a power generator and a compressor engine at the plant. Deadline for submitting a Statement of Concern is July 6, 2018 in the following location:

02-037-10W5M

 

00073203-008 - Williams Energy Canada ULC
Closed

Williams Energy Canada ULC has submitted a request to extend the expiry of the existing approval for their Fort McMurray Hydrocarbon Liquids Extraction Facility. The extension will allow the Alberta Energy Regulator time to review the renewal application that has been submitted in the following locations:

26-092-09W4M
12-092-10W4M

 

00387835-001 - Tidewater Midstream and Infrastructure Ltd.
Approved

Tidewater Midstream and Infrastructure Ltd. has submitted an application under Specified Enactments (Environmental Protection and Enhancement Act) for an approval to construct 25.15 km of 712 o.d. mm sweet natural gas pipeline called the Hythe Lateral Pipeline (west of Grande Prairie). The proposed pipeline right-of-way (ROW) will originate at a riser site at LSD 15 of Section 30 Township 71 Range 8 West of the 6th Meridian and will continue north to 2 separate riser sites located at LSD 6 of Section 19 Township 73 Range 8 West of the 6th Meridian and LSD 5 of Section 30 Township 73 Range 8 West of the 6th Meridian. The deadline for submitting a statement of concern is January 24, 2017 in the following locations:

30-071-08W6M
31-071-08W6M
06-072-08W6M
07-072-08W6M
17-072-08W6M
18-072-08W6M
20-072-08W6M
29-072-08W6M
30-072-08W6M
31-072-08W6M
06-073-08W6M
07-073-08W6M
18-073-08W6M
19-073-08W6M
30-073-08W6M
36-071-09W6M
01-072-09W6M

 

00017429-004 - Direct Energy Marketing Limited
Approved

An application has been submitted for a consent to transfer the existing Environmental Protection and Enhancement Act Code of Practice Registration for the Gilby Inlet Compressor Station from Direct Energy Marketing Limited to Canlin Energy Corporation. The deadline for submission of Statements of Concern is November 15, 2017 in the following location:

22-040-03W5M

 

00010801-013 - Gibson Energy ULC
Approved

Gibson Energy ULC has submitted an application under the Environmental Protection and Enhancement Act for an amendment of their existing approval of the Hardisty Terminal Bulk Petroleum Storage Facility. The amendment application is to obtain partial approval for the stripping and grading of the proposed development area to avoid impacts of winter construction and to obtain an approval for the construction of the six aboveground storage tanks. The deadline for submission of Statements of Concern is June 7, 2017 in the following locations:

08-042-08W4M
19-042-09W4M
20-042-09W4M
29-042-09W4M
30-042-09W4M

 

00381752-003 - Gibson Energy ULC
Approved

Amend a previously granted EPEA code of practice for Hydrostatic Testing in the following locations:

08-042-08W4M
19-042-09W4M
20-042-09W4M
29-042-09W4M
30-042-09W4M

 

00001400-005 - NAL Resources Limited
Approved

An application has been submitted under the Environmental Protection and Enhancement Act for an amendment to an existing registration to change the registration holder name from NAL Resources Limited to Pengrowth Energy Corporation. The registration pertains to the Garrington 6-36 Battery Compressor Station in the following location:

36-035-05W5M

 

00010040-005 - Endurance Energy Ltd.
Withdrawn

Endurance Energy Ltd. has submitted an application under the Environmental Protection and Enhancement Act to update the registration of the Birch Lake Compressor Station located in LSD 4 of Section 5 Township 50 Range 11 West of the 4th Meridian (southwest of Innisfree) in the following location:

05-050-11W4M

 

00010154-024 - Taylor Processing Inc.
Approved

Taylor Processing Inc. has submitted an application under the Environmental Protection and Enhancement Act for a renewal of an existing approval for the Harmattan sour gas plant. The facility is located in LSD 9 of Section 27 Township 31 Range 4 West of the 5th Meridian (approximately 13 km north of Cremona) and has a capacity 13,897.6 X 10^3 m^3/d and consists of sweet and sour natural gas processing, inlet separation and compression and regenerative sweetening and elemental sulphur recovery. The deadline for submitting a statement of concern is July 1, 2015 in the following location:

27-031-04W5M

 

00381939-002 - Pembina Pipeline Corporation
Withdrawn

Amend a previously granted EPEA code of practice for Hydrostatic Testing in the following locations:

14-055-22W4M
15-053-23W4M
17-053-23W4M
20-053-23W4M
05-054-23W4M
35-054-24W4M