Company

Decision Type

Location

Sec.
-
Twp.
-
Rge.
-
Mer.
-
Select a
Meridian
(Mer.) first

Meridian

W4M135 W5M78 W6M45
 

Results : 1 - 10 of 261

00418164-001 - Canadian Natural Resources Limited
Closed

Canadian Natural Resources Limited has submitted a request for a Letter of Authorization for the re-use of industrial wastewater from ATCO's Valleyview Thermal Electric Power Plant for injection purposes (enhanced oil recovery) in LSD 6 of Section 8 Township 69 Range 21 West of the 5th Meridian and LSD 8 of Section 12 Township 69 Range 22 West of the 5th Meridian in the following locations:

08-069-21W5M
12-069-22W5M

 

00011428-012 - Canadian Natural Resources Limited
Approved

Canadian Natural Resources Limited has requested a renewal under Environmental Protection and Enhancement Act for Progress Sour Gas Plant. Deadline for submitting a Statement of Concern is October 13, 2018 in the following location:

22-078-09W6M

 

00423625-001 - Gibson Energy ULC
Approved

Gibson Energy ULC has submitted an application under the Environmental Protection and Enhancement Act for the release of hydrostatic test water to land. Volume of water to be released 1400 m3, rate of release 100 m3/hr in the following locations:

17-035-03W4M
20-035-03W4M
21-035-03W4M
28-035-03W4M
33-035-03W4M
03-036-03W4M
04-036-03W4M
05-036-03W4M
09-036-03W4M
10-036-03W4M
16-036-03W4M
18-036-03W4M
19-036-03W4M
20-036-03W4M
21-036-03W4M
27-036-03W4M
28-036-03W4M
34-036-03W4M
02-037-03W4M
03-037-03W4M
10-037-03W4M
15-037-03W4M
16-037-03W4M
20-037-03W4M
21-037-03W4M
29-037-03W4M
32-037-03W4M
05-038-03W4M
08-038-03W4M
17-038-03W4M
20-038-03W4M
29-038-03W4M
32-038-03W4M
05-039-03W4M
06-039-03W4M
07-039-03W4M
04-036-04W4M
05-036-04W4M
06-036-04W4M
09-036-04W4M
13-036-04W4M
14-036-04W4M
15-036-04W4M
16-036-04W4M
27-035-05W4M
28-035-05W4M
29-035-05W4M
30-035-05W4M
34-035-05W4M
35-035-05W4M
01-036-05W4M
02-036-05W4M
16-035-06W4M
17-035-06W4M
18-035-06W4M
21-035-06W4M
22-035-06W4M
25-035-06W4M
26-035-06W4M
27-035-06W4M
13-035-07W4M
14-035-07W4M
15-035-07W4M
16-035-07W4M
17-035-07W4M
18-035-07W4M
20-034-08W4M
29-034-08W4M
32-034-08W4M
33-034-08W4M
04-035-08W4M
09-035-08W4M
13-035-08W4M
14-035-08W4M
15-035-08W4M
16-035-08W4M
21-035-08W4M
28-035-08W4M
33-035-08W4M
04-036-08W4M

 

00049430-007 - Canadian Natural Resources Limited
Approved

Canadian Natural Resources Limited has submitted an application under the Environmental Protection and Enhancement Act for an amendment to an existing approval to amend the net heating value from 22 MJ/m3 to 20 MJ/m3 in Section 4.1.10 of the approval in the following location:

16-098-05W6M

 

00000231-018 - TAQA North Ltd.
Approved

TAQA North Ltd. has submitted an application under Specified Enactments (Environmental Protection and Enhancement Act) for a renewal of an existing approval for the continued operation of the East Crossfield Sour Gas Plant located in LSD 9 of Section 14 Township 28 Range 1 West of the 5th Meridian (approximately 1.2 km south of Crossfield) and the licenced capacity is 2064 x 10^3 m^3/d. High pressure and low pressure sour natural gas, condensate and water are brought to the plant by pipeline. Condensate and water are separated from the gas at the inlet. The low pressure gas is compressed and added to the high pressure gas. The Hydrogen Sulphide (H2S) is separated from the gas in an amine (Sulphinol) contactor. The gas is then sent to a refrigeration plant to recover propane (C3), butane (C4) and condensate (C5+). The gas is then compressed again and sent to the sales gas line. The deadline for submitting a statement of concern is January 12, 2018 in the following location:

14-028-01W5M

 

00010269-012 - TAQA North Ltd.
Approved

TAQA North Ltd. is requesting a renewal to the existing approval under Environmental Protection and Enhancement Act for the operation of the Swalwell Gas Processing Plant. Deadline for submitting a Statement of Concern is October 14, 2018 in the following locations:

14-029-24W4M
15-029-24W4M

 

00418823-001 - Pipestone Energy Corp.
Approved

Pipestone Oil Corp. has submitted an application under the Environmental Protection and Enhancement Act for the Project Pipestone Pipeline. The Project will be located within the White Area of Alberta, southwest of Grande Prairie. The Project consists of the construction and operation of three pipeline segments: North leg: The group of pipelines between 6-30-71-7 W6M and 6-1-71-8 W6M. Middle Leg: The group of pipelines between 3-1-71-8 W6M and 15-14-70-8 W6M. South Leg: The group of pipeline between 15-14-70-8 W6M and 6-13-70-8 W6M, 15-14-70-8 W6M and 11-13-70-8 W6M, and 6-13-70-8 W6M and 11-13-70-8 W6M. The pipeline infrastructure will consist of gathering and distribution systems to be installed along approximately 21 km of right-of-way. Produced gas, condensate, and water will be transported together in gas effluent pipelines. Deadline for submission of Statements of Concern is September 1, 2018 in the following locations:

31-070-07W6M
06-071-07W6M
30-071-07W6M
13-070-08W6M
14-070-08W6M
24-070-08W6M
25-070-08W6M
36-070-08W6M
01-071-08W6M
12-071-08W6M
13-071-08W6M
24-071-08W6M
25-071-08W6M

 

00419168-001 - Tidewater Midstream and Infrastructure Ltd.
Approved

Tidewater Midstream and Infrastructure Ltd. has submitted an application under the Environmental Protection and Enhancement Act for the construction and reclamation of the right of way for the Pioneer Natural Gas Pipeline Project. The pipeline will be approximately 119.4 km of 508 mm outside diameter pipeline in Townships 48, 49, 50 and 51, Ranges 3 to 12 West of the 5th Meridian. The proposed sweet gas pipeline will be installed at the Brazeau River Complex in LSD 4 of Section 31 Township 48 Range 12 West of the 5th Meridian and connect to the Keephills Generation Station in LSD 8 of Section 36 Township 51 Range 4 West of the 5th Meridian. The deadline for submitting a statement of concern is September 14, 2018 in the following locations:

30-051-03W5M
31-051-03W5M
20-051-04W5M
21-051-04W5M
22-051-04W5M
23-051-04W5M
24-051-04W5M
25-051-04W5M
29-051-04W5M
31-051-04W5M
32-051-04W5M
36-051-04W5M
05-051-05W5M
06-051-05W5M
08-051-05W5M
09-051-05W5M
16-051-05W5M
21-051-05W5M
27-051-05W5M
28-051-05W5M
34-051-05W5M
35-051-05W5M
36-051-05W5M
28-050-06W5M
29-050-06W5M
30-050-06W5M
32-050-06W5M
33-050-06W5M
34-050-06W5M
01-051-06W5M
02-051-06W5M
07-050-07W5M
18-050-07W5M
19-050-07W5M
20-050-07W5M
21-050-07W5M
22-050-07W5M
23-050-07W5M
25-050-07W5M
26-050-07W5M
02-050-08W5M
03-050-08W5M
04-050-08W5M
05-050-08W5M
07-050-08W5M
08-050-08W5M
09-050-08W5M
10-050-08W5M
11-050-08W5M
12-050-08W5M
00-050-09W5M
10-050-09W5M
11-050-09W5M
12-050-09W5M
00-049-10W5M
00-050-10W5M
00-049-11W5M
36-049-11W5M
00-050-11W5M
31-048-12W5M
00-049-12W5M
06-049-12W5M
07-049-12W5M
00-050-12W5M

 

00048408-012 - Suncor Energy Inc.
Approved

Suncor Energy Inc. has submitted an application under the Environmental Protection and Enhancement Act for an amendment of their existing approval of the MacKay River SAGD In-Situ Project. The amendment is for an in-situ demonstration facility experimental pilot project which includes project operations and decommissioning. The deadline for submission of Statements of Concern is May 18, 2018 in the following locations:

21-092-12W4M
28-092-12W4M
32-092-12W4M
33-092-12W4M
34-092-12W4M
04-093-12W4M
05-093-12W4M
06-093-12W4M
07-093-12W4M
08-093-12W4M
09-093-12W4M
16-093-12W4M
17-093-12W4M
20-093-12W4M
21-093-12W4M

 

00049587-015 - Shell Canada Limited
Approved

Shell Canada Limited has submitted an application under Specified Enactments (Environmental Protection and Enhancement Act) for a renewal of an existing approval for the Scotford Upgrader located in the N 1/2 of Section 28, S 1/2 & NW 1/4 of Section 30, Section 31, NW 1/4 of Section 32, Section 33 Township 55 Range 21 West of the 4th Meridian and the N 1/2 of Section 4, N 1/2 & SW 1/4 of Section 5, SE 1/4 of Section 6, S 1/2 & NE 1/4 of Section 8, W 1/2 of Sectoin 9 and the S 1/2 & NW 1/4 of Section 16 Township 56 Range 21 West of the 4th Meridian. The Upgrader is part of the Athabasca Oil Sands Project and is an integrated bitumen production and upgrading operation. It has a nominal bitumen feed capacity of 290 000 bbl/cd (1,921 m3/hr). The Upgrader consists of three bitumen processing trains. The deadline for submitting a statement of concern is November 16, 2017 in the following locations:

28-055-21W4M
30-055-21W4M
31-055-21W4M
32-055-21W4M
33-055-21W4M
04-056-21W4M
05-056-21W4M
06-056-21W4M
08-056-21W4M
09-056-21W4M
16-056-21W4M
13-055-22W4M