Location

Sec.
-
Twp.
-
Rge.
-
Mer.
-
Select a
Meridian
(Mer.) first

Meridian

W5M2125 W4M892 W6M700 W9M2
 

Results : 41 - 50 of 3707

1783139 - TAQA North Ltd.
Approved

Application to construct and operate a natural gas pipeline with less than or equal to 323.9 millimetre outside diameter (mm OD.) in the following locations:

18-077-10W6M
19-077-10W6M
20-077-10W6M
29-077-10W6M
32-077-10W6M

 

1783289 - TAQA North Ltd.
Closed

Application to amend an existing licence for a multiwell gas battery with less than 0.01 moles per kilomole hydrogen sulfide (H2S) in the inlet stream in the following location:

04-113-04W6M

 

1783542 - TAQA North Ltd.
Approved

Application to construct and operate a level 2 natural gas pipeline with less than or equal to 323.9 millimetre outside diameter (mm OD.) in the following locations:

19-077-10W6M
20-077-10W6M
29-077-10W6M

 

1783543 - TAQA North Ltd.
Approved

Application to construct and operate a level 2 natural gas pipeline with less than or equal to 323.9 millimetre outside diameter (mm OD.) in the following locations:

19-077-10W6M
20-077-10W6M
29-077-10W6M

 

1783568 - TAQA North Ltd.
Approved

Application to construct and operate a natural gas pipeline with less than or equal to 323.9 millimetre outside diameter (mm OD.) in the following locations:

20-077-10W6M
29-077-10W6M

 

1783626 - TAQA North Ltd.
Closed

Application to change the spacing of gas wells in a defined area in the following locations:

04-078-11W6M
05-078-11W6M
06-078-11W6M

 

1783804 - TAQA North Ltd.
Approved

Application to construct and operate a natural gas pipeline with less than or equal to 323.9 millimetre outside diameter (mm OD.) in the following location:

34-042-04W5M

 

1783862 - TAQA North Ltd.
Closed

Application to construct and operate a pipeline line heater in the following location:

22-077-10W6M

 

1783966 - TAQA North Ltd.
Approved

Application to construct and operate a single well with greater than 0.00 moles per kilomole hydrogen sulfide (H2S) content and with less than 0.01 cubic metres per second (m3/s) hydrogen sulfide (H2S) release rate in the following location:

25-033-06W5M

 

1784061 - TAQA North Ltd.
Approved

Application to amend an existing licence for a natural gas pipeline with less than or equal to 323.9 millimetre outside diameter (mm OD.) in the following location:

27-046-09W5M