Results : 1 - 10 of 932

1910577 - ORLEN Upstream Canada Ltd.
Approved

Application to construct and operate a single well with greater than 0.00 moles per kilomole hydrogen sulfide (H2S) content and with less than 0.01 cubic metres per second (m3/s) hydrogen sulfide (H2S) release rate in the following location:

14-063-06W6M

 

00415906-001 - ORLEN Upstream Canada Ltd.
Approved

To receive an application for a Water Act temporary diversion licence for commercial water diversion in the following location:

10-063-06W6M

 

A10077415 - ORLEN Upstream Canada Ltd.
Approved

Application for a new temporary field authorization in the following location:

02-039-09W5M

 

A10077441 - ORLEN Upstream Canada Ltd.
Closed

Application for a new temporary field authorization in the following location:

30-063-05W6M

 

A10075843 - ORLEN Upstream Canada Ltd.
Approved

Application to amend a previously authorized mineral surface lease in the following location:

26-064-08W6M

 

A10075844 - ORLEN Upstream Canada Ltd.
Approved

Application to amend a previously authorized licence of occupation in the following location:

26-064-08W6M

 

1910341 - ORLEN Upstream Canada Ltd.
Approved

Application to construct and operate a single well with greater than 0.00 moles per kilomole hydrogen sulfide (H2S) content and with less than 0.01 cubic metres per second (m3/s) hydrogen sulfide (H2S) release rate in the following location:

10-063-06W6M

 

A10077127 - ORLEN Upstream Canada Ltd.
Closed

Application to amend a previously authorized use of land related to pipeline construction in the following locations:

24-060-18W5M
18-011-11W4M

 

A10077153 - ORLEN Upstream Canada Ltd.
Approved

Application for a new temporary field authorization in the following locations:

24-038-08W5M
19-038-08W5M

 

337204 - ORLEN Upstream Canada Ltd.
Approved

Application under the provisions of the Water Act for a Water Approval for the construction of works that will temporarily impact 0.16 hectares (ha) through Wetland Assessment Impact Form.Application under the provisions of the Water Act for a Water Approval for a general activity that may impact Ephemeral Draw/Drainage in the following locations:

17-063-05W6M
08-063-05W6M