Location

Sec.
-
Twp.
-
Rge.
-
Mer.
-
Select a
Meridian
(Mer.) first

Meridian

W5M93 W4M50 W6M16
 

Results : 61 - 70 of 158

1256397 - Long Run Exploration Ltd.
Approved

Application under the provisions of the Pipeline Act to amend an existing licence for Natural Gas pipeline with 0 mol\kmol hydrogen sulphide (H2S) in the following locations:

16-030-19W4M
09-030-19W4M

 

1257551 - Long Run Exploration Ltd.
Approved

Application under the provisions of the Pipeline Act to amend an existing licence for Natural Gas pipeline with 0 mol\kmol hydrogen sulphide (H2S) in the following location:

23-045-10W4M

 

1258221 - Long Run Exploration Ltd.
Approved

Application under the provisions of the Pipeline Act to amend an existing licence for Natural Gas pipeline with 0 mol\kmol hydrogen sulphide (H2S) in the following locations:

30-045-11W4M
29-045-11W4M
18-046-11W4M
07-046-11W4M
06-046-11W4M

 

1258575 - Long Run Exploration Ltd.
Approved

Application under the provisions of the Pipeline Act to amend an existing licence for Natural Gas pipeline with 0 mol\kmol hydrogen sulphide (H2S) in the following locations:

31-045-11W4M
14-045-11W4M
06-046-11W4M

 

1258714 - Long Run Exploration Ltd.
Approved

Application under the provisions of the Pipeline Act to amend an existing licence for Natural Gas pipeline with 0 mol\kmol hydrogen sulphide (H2S) in the following location:

09-046-11W4M

 

1258954 - Long Run Exploration Ltd.
Approved

Application under the provisions of the Pipeline Act to amend an existing licence for Natural Gas pipeline with 0 mol\kmol hydrogen sulphide (H2S) in the following locations:

36-045-11W4M
25-045-11W4M
24-045-11W4M
23-045-11W4M

 

1923382 - Long Run Exploration Ltd.
Approved

Application to construct and operate a single well with greater than or equal to 0.01 cubic metres per second (m3/s) but with less than 0.3 cubic metres per second (m3/s) hydrogen sulfide (H2S) release rate in the following location:

09-007-25W4M

 

1923383 - Long Run Exploration Ltd.
Approved

Application to construct and operate a single well with greater than or equal to 0.01 cubic metres per second (m3/s) but with less than 0.3 cubic metres per second (m3/s) hydrogen sulfide (H2S) release rate in the following location:

20-007-25W4M

 

1923384 - Long Run Exploration Ltd.
Approved

Application to construct and operate a single well with greater than or equal to 0.01 cubic metres per second (m3/s) but with less than 0.3 cubic metres per second (m3/s) hydrogen sulfide (H2S) release rate in the following location:

36-007-26W4M

 

00011416-012 - Long Run Exploration Ltd.
Approved

Long Run Exploration Ltd. has submitted an application under the Environmental Protection and Enhancement Act for a renewal of their existing approval of the Cherhill Sour Gas Plant. The deadline for submission of Statements of Concern is August 25, 2019 in the following location:

25-056-06W5M