Location

Sec.
-
Twp.
-
Rge.
-
Mer.
W6M
Select a
Range
(Rge.) first

Range

08 15 10 11 01 10 07 10 03 7 09 7 02 6 06 6 04 3 11 3 05 1
 

Results : 1 - 10 of 66

1786524 - Husky Oil Operations Limited
Withdrawn

Application to change the spacing of oil wells in a defined area in the following locations:

19-067-08W6M
24-067-09W6M

 

1786523 - Husky Oil Operations Limited
Withdrawn

Application to change the spacing of oil wells in a defined area in the following locations:

30-066-07W6M
31-066-07W6M
06-067-07W6M
07-067-07W6M
25-066-08W6M
36-066-08W6M
01-067-08W6M
02-067-08W6M
11-067-08W6M
12-067-08W6M
13-067-08W6M
14-067-08W6M

 

00353515-001 - Husky Oil Operations Limited
Withdrawn

To receive an application for a Water Act temporary diversion licence for commercial water diversion in the following location:

32-062-04W6M

 

00358596-001 - Husky Oil Operations Limited
Withdrawn

To receive an application for a Water Act temporary diversion licence for commercial water diversion in the following locations:

30-103-24W5M
12-104-01W6M
22-105-01W6M

 

00358597-001 - Husky Oil Operations Limited
Withdrawn

To receive an application for a Water Act temporary diversion licence for commercial water diversion in the following locations:

11-108-23W5M
34-107-24W5M
01-108-24W5M
09-108-24W5M
24-108-24W5M
36-105-25W5M
36-106-25W5M
28-104-01W6M
05-105-01W6M
07-105-01W6M
14-106-01W6M
17-106-01W6M
27-106-01W6M
22-105-02W6M
18-106-02W6M
16-106-03W6M

 

00358609-001 - Husky Oil Operations Limited
Withdrawn

To receive an application for a Water Act temporary diversion licence for commercial water diversion in the following locations:

25-105-03W6M
03-106-03W6M

 

00001820-014 - Husky Oil Operations Limited
Withdrawn

Husky Oil Operations Limited has submitted an application for an amendment to an existing approval under the Environmental Protection and Enhancement Act for modifications to the stormwater managment system associated with the Rainbow Lake Sour Gas Plant. The proposed stormwater management system modification includes the addition of collection and testing ponds that will allow for the separate collection, treatment and testing of runoff from the plant site. The drainage ditch system will be upgraded through site grading and ditch installation to connect the existing stormwater management system to the new collection and testing ponds. The facility is located in LSD 10 of Section 10 Township 109 Range 8 West of the 6th Meridian (approximately 8 km southeast of the Town of Rainbow Lake in the following location:

10-109-08W6M

 

1815564 - Husky Oil Operations Limited
Withdrawn

Application to amend an enhanced recovery scheme in the following location:

  108-10W6M

 

00361957-001 - Husky Oil Operations Limited
Withdrawn

To receive an application for a Water Act temporary diversion licence for commercial water diversion in the following locations:

20-066-07W6M
29-066-07W6M
02-067-08W6M
11-067-08W6M

 

1827896 - Husky Oil Operations Limited
Withdrawn

Application to construct and operate a sour service oil effluent pipeline with less than or equal to 323.9 millimetre outside diameter (mm OD.) in the following location:

10-109-08W6M