Location

Sec.
-
Twp.
-
Rge.
-
Mer.
-
Select a
Meridian
(Mer.) first

Meridian

W4M1
 

Results : 1 - 1 of 1

00361239-001 - Granite Oil Corp.
Closed

DeeThree Exploration Ltd. has submitted an application under the Environmental Protection and Enhancement Act to construct an approximately 61.5 km long pipeline called the Rail Terminal Pipeline Project, located about 30 km southeast of Lethbridge, Alberta. Pending regulatory approvals, pipeline construction is scheduled to commence in fall 2014, with anticipated completion in spring 2015. The proposed project entails the construction of two (2) 219.1 mm outside diameter (O.D.) pipelines within a 15 m wide right-of-way. One (1) pipe will convey sweet crude oil from DeeThree¿s battery site at 3-25-3-17 W4M to a rail loading facility located at 11-27-7-20 W4M. The second pipe will return sweet oil from the rail loading facility to the battery site. The deadline for filing a statement of concern will be January 5, 2015 in the following locations:

25-003-17W4M
35-003-17W4M
36-003-17W4M
02-004-17W4M
11-004-17W4M
14-004-17W4M
15-004-17W4M
21-004-17W4M
22-004-17W4M
28-004-17W4M
33-004-17W4M
04-005-17W4M
05-005-17W4M
07-005-17W4M
08-005-17W4M
18-005-17W4M
13-005-18W4M
23-005-18W4M
24-005-18W4M
26-005-18W4M
27-005-18W4M
28-005-18W4M
33-005-18W4M
04-006-18W4M
05-006-18W4M
07-006-18W4M
08-006-18W4M
18-006-18W4M
13-006-19W4M
24-006-19W4M
25-006-19W4M
26-006-19W4M
27-006-19W4M
34-006-19W4M
02-007-19W4M
03-007-19W4M
04-007-19W4M
05-007-19W4M
07-007-19W4M
08-007-19W4M
18-007-19W4M
13-007-20W4M
14-007-20W4M
22-007-20W4M
23-007-20W4M
27-007-20W4M