00408207-001 - ATCO Gas And Pipelines Ltd.
Closed

ATCO Gas and Pipelines Ltd. has submitted an application under the Environmental Protection and Enhancement Act for construction of the Keephills Pipeline Project. The Project is located east of Drayton Valley, Alberta and will transport natural gas from NW 28-48-7 W5M to SE 25-50-3 W5M. This Project will involve the construction of approximately 59 kilometres of 762 millimetre outside diameter (30-inch) pipe and the installation of two valve sites to be located along the proposed pipeline right-of-way (ROW) at 15-25-48-7 W5M (Kilometre Post [KP] 7.09) and 8-23-49-5 W5M (KP 29.4). The deadline for submission of Statements of Concern is February 18, 2018 in the following locations:

30-050-02W5M
04-050-03W5M
05-050-03W5M
06-050-03W5M
09-050-03W5M
10-050-03W5M
11-050-03W5M
14-050-03W5M
23-050-03W5M
24-050-03W5M
25-050-03W5M
19-049-04W5M
20-049-04W5M
21-049-04W5M
22-049-04W5M
27-049-04W5M
34-049-04W5M
35-049-04W5M
36-049-04W5M
01-050-04W5M
07-049-05W5M
14-049-05W5M
15-049-05W5M
16-049-05W5M
17-049-05W5M
18-049-05W5M
23-049-05W5M
24-049-05W5M
31-048-06W5M
32-048-06W5M
02-049-06W5M
03-049-06W5M
04-049-06W5M
05-049-06W5M
11-049-06W5M
12-049-06W5M
25-048-07W5M
26-048-07W5M
27-048-07W5M
28-048-07W5M
36-048-07W5M

 

00415363-001 - ATCO Gas And Pipelines Ltd.
Approved

ATCO Gas and Pipelines Ltd. has submitted an application under the Environmental Protection and Enhancement Act for construction of the Keephills Pipeline Project. The Project is located east of Drayton Valley, Alberta and will transport natural gas from NW 28-48-7 W5M to SE 25-50-3 W5M. The Project will involve the construction of approximately 800 metres of 610-millimetre (24-inch) outside diameter (O.D.) pipe and approximately 58 kilometres of 762-mm O.D. (30-inch) pipe. The Project will also involve the installation of two valve sites to be located along the proposed pipeline right-of-way at 15-25-48-7 W5M (Kilometre Post [KP] 7.09) and 8-23-49-5 W5M (KP 29.4). Deadline for submission of Statements of Concern is June 29, 2018 in the following locations:

30-050-02W5M
04-050-03W5M
05-050-03W5M
06-050-03W5M
09-050-03W5M
10-050-03W5M
11-050-03W5M
14-050-03W5M
23-050-03W5M
24-050-03W5M
25-050-03W5M
19-049-04W5M
20-049-04W5M
21-049-04W5M
22-049-04W5M
27-049-04W5M
34-049-04W5M
35-049-04W5M
36-049-04W5M
01-050-04W5M
07-049-05W5M
14-049-05W5M
15-049-05W5M
16-049-05W5M
17-049-05W5M
18-049-05W5M
23-049-05W5M
24-049-05W5M
31-048-06W5M
32-048-06W5M
02-049-06W5M
03-049-06W5M
04-049-06W5M
05-049-06W5M
11-049-06W5M
12-049-06W5M
25-048-07W5M
26-048-07W5M
27-048-07W5M
28-048-07W5M
36-048-07W5M

 

00010381-005 - ATCO Gas And Pipelines Ltd.
Approved

ATCO Gas has requested cancellation of the registration under the Environmental Protection and Enhancement Act for the Fairdell-Bon Accord Gas Plant as the site has been fully docommissioned in the following location:

20-056-23W4M

 

00374014-001 - ATCO Gas And Pipelines Ltd.
Approved

ATCO Gas and Pipelines Ltd. has submitted an application under the Environmental Protection and Enhancement Act to construct the Pembina Expansion Project from the existing ATCO Pembina Wye Control at the SE 1/4 of Section 9 Township 48 Range 8 West of the 5th Meridian to the existing ATCO Pembina Lobstick Control at the NW 1/4 of Section 28 Township 48 Range 7 West of the 5th Meridian. The pipeline will be approximately 10.8 km in length and will generally follow existing pipeline rights of way. The deadline for submitting a statement of concern is January 15, 2016 in the following locations:

28-048-07W5M
29-048-07W5M
30-048-07W5M
25-048-08W5M
26-048-08W5M
27-048-08W5M
28-048-08W5M
29-048-08W5M
28-047-09W5M
29-047-09W5M
30-047-09W5M
34-047-09W5M
25-047-10W5M
26-047-10W5M
35-047-10W5M
03-048-10W5M

 

00373613-001 - ATCO Gas And Pipelines Ltd.
Approved

ATCO Gas and PIpelines Ltd., operating as ATCO Pipelines, has submitted an application under the Environmental Protection and Enhancement Act to constuct the Inland Loop Pipeline Project which consists of a 508 mm (20 inch) high pressure, sweet natural gas pipeline 19 km in length from the SW 1/4 of Section 34 Township 53 Range 18 West of the 4th Meridian to the SE 1/4 of Section 5 Township 55 Range 19 West of the 4th Meridan (in the Lamont area). The purpose of the proposed pipeline is to increase capacity on ATCO Pipelines' existing Inland System to meet the growing demand for natural gas in both Fort Saskatchewan and Edmonton. Construction of the proposed pipeline and related above ground facilities is anticipated to start in the summer of 2016 and to be completed by November of that year. The deadline for submitting a statement of concern is January 11, 2016 in the following locations:

33-053-18W4M
34-053-18W4M
04-054-18W4M
05-054-18W4M
07-054-18W4M
08-054-18W4M
12-054-19W4M
13-054-19W4M
14-054-19W4M
22-054-19W4M
23-054-19W4M
27-054-19W4M
28-054-19W4M
32-054-19W4M
33-054-19W4M
04-055-19W4M
05-055-19W4M

 

00388053-001 - ATCO Gas And Pipelines Ltd.
Approved

To receive an EPEA code of practice application in the following locations:

33-053-18W4M
34-053-18W4M
04-054-18W4M
05-054-18W4M
07-054-18W4M
08-054-18W4M
12-054-19W4M
13-054-19W4M
14-054-19W4M
22-054-19W4M
23-054-19W4M
27-054-19W4M
28-054-19W4M
32-054-19W4M
33-054-19W4M
04-055-19W4M
05-055-19W4M

 

00388053-002 - ATCO Gas And Pipelines Ltd.
Approved

Amend a previously granted EPEA code of practice for Hydrostatic Testing in the following locations:

33-053-18W4M
34-053-18W4M
04-054-18W4M
05-054-18W4M
07-054-18W4M
08-054-18W4M
12-054-19W4M
13-054-19W4M
14-054-19W4M
22-054-19W4M
23-054-19W4M
27-054-19W4M
28-054-19W4M
32-054-19W4M
33-054-19W4M
04-055-19W4M
05-055-19W4M

 

00010426-004 - ATCO Gas And Pipelines Ltd.
Approved

Amend a previously granted EPEA code of practice for Compressor & Sweet Gas in the following location:

16-051-19W4M

 

00398411-001 - ATCO Gas And Pipelines Ltd.
Approved

To receive an EPEA application for an oil or gas pipeline in the following locations:

19-022-01W5M
30-022-01W5M
31-022-01W5M
06-023-01W5M
19-023-01W5M
01-023-02W5M
12-023-02W5M
13-023-02W5M
24-023-02W5M
25-023-02W5M
26-023-02W5M
35-023-02W5M
03-024-02W5M

 

00401605-001 - ATCO Gas And Pipelines Ltd.
Approved

ATCO Pipelines has submitted a registration of release application under Specified Enactments (Code of Practice for Hydrostatic Testing) to release up to 1300 m3 of water that they will be using to test a portion of their newly constructed pipeline, the Southwest Calgary Connector Pipeline. The release will be to land in the SE 1/4 of Section 5 Township 25 Range 2 West of the 5th Meridian within Calgary city limits in the following location:

05-025-02W5M