Public Notice of Applications

Location

Sec.
-
Twp.
-
Rge.
-
Mer.
-

Meridian

W5M 18 W4M 2 W6M 2
 

Results : 1 - 10 of 21

00000279-017 - SemCAMS ULC

SemCAMS ULC has submitted an application under the Environmental Protection and Enhancement Act for an amendment to an existing approval for Kaybob Amalgamated Sour Gas Plant to update the plant’s acid gas disposal methods. SemCAMS ULC plans to add acid gas injection. The plant is located on freehold land within the Municipal District of Greenview, approximately 8.6 km from the Town of Fox Creek, Alberta. The deadline for submission of Statements of Concern is September 15, 2018 in the following locations:

01-062-20W5M
12-062-20W5M

 

00011271-009 - ARC Resources Ltd.

ARC Resources Ltd. has submitted an application under the Environmental Protection and Enhancement Act for a renewal of an existing approval for the Pembalta #4 Sour Gas Plant. The plant is located in LSD 9 of Section 16 Township 49 Range 8 West of the 5th Meridian (approximately 8.4 km from Drayton Valley) and has a capacity totalling 310 x 10^3 m^3/d of raw gas and condensate. The primary of the plant is to process raw gas to remove hydrogen sulfide, gas liquids, and water from the raw gas to yield dry, sweet natural gas of sales gas quality. The deadline for submitting a statement of concern is September 17, 2018 in the following location:

16-049-08W5M

 

00000131-006 - Paramount Resources Ltd.

Paramount Resources Ltd. has requested an amendment under Environmental Protection and Enhancement Act for Bigstone Dunvegan Sweet Gas Compressor Station. Deadline for submitting a Statement of Concern is September 14, 2018 in the following location:

24-060-22W5M

 

00419437-001 - Keyera Corp.

To receive an EPEA code of practice application in the following locations:

05-063-25W5M
01-065-02W6M
20-066-04W6M
02-068-06W6M
19-068-06W6M
30-066-07W6M
24-068-07W6M

 

00011031-015 - Gibson Energy ULC

Gibson Energy ULC has submitted an application under the Environmental Protection and Enhancement Act for an amendment to extend the expiry date of an existing approval. The approval pertains to the Edmonton South Terminal Bulk Petroleum Storage Facility in the following locations:

05-053-23W4M
06-053-23W4M

 

00419168-001 - Tidewater Midstream and Infrastructure Ltd.

Tidewater Midstream and Infrastructure Ltd. has submitted an application under the Environmental Protection and Enhancement Act for the construction and reclamation of the right of way for the Pioneer Natural Gas Pipeline Project. The pipeline will be approximately 119.4 km of 508 mm outside diameter pipeline in Townships 48, 49, 50 and 51, Ranges 3 to 12 West of the 5th Meridian. The proposed sweet gas pipeline will be installed at the Brazeau River Complex in LSD 4 of Section 31 Township 48 Range 12 West of the 5th Meridian and connect to the Keephills Generation Station in LSD 8 of Section 36 Township 51 Range 4 West of the 5th Meridian. The deadline for submitting a statement of concern is September 14, 2018 in the following locations:

30-051-03W5M
31-051-03W5M
20-051-04W5M
21-051-04W5M
22-051-04W5M
23-051-04W5M
24-051-04W5M
25-051-04W5M
29-051-04W5M
31-051-04W5M
32-051-04W5M
36-051-04W5M
05-051-05W5M
06-051-05W5M
08-051-05W5M
09-051-05W5M
16-051-05W5M
21-051-05W5M
27-051-05W5M
28-051-05W5M
34-051-05W5M
35-051-05W5M
36-051-05W5M
28-050-06W5M
29-050-06W5M
30-050-06W5M
32-050-06W5M
33-050-06W5M
34-050-06W5M
01-051-06W5M
02-051-06W5M
07-050-07W5M
18-050-07W5M
19-050-07W5M
20-050-07W5M
21-050-07W5M
22-050-07W5M
23-050-07W5M
25-050-07W5M
26-050-07W5M
02-050-08W5M
03-050-08W5M
04-050-08W5M
05-050-08W5M
07-050-08W5M
08-050-08W5M
09-050-08W5M
10-050-08W5M
11-050-08W5M
12-050-08W5M
00-050-09W5M
10-050-09W5M
11-050-09W5M
12-050-09W5M
00-049-10W5M
00-050-10W5M
00-049-11W5M
00-050-11W5M
31-048-12W5M
00-049-12W5M
06-049-12W5M
07-049-12W5M
00-050-12W5M

 

00010233-013 - Tidewater Midstream and Infrastructure Ltd.

Tidewater Midstream and Infrastructure Ltd. has requested a renewal of their existing approval under Environmental Protection and Enhancement Act for Paddle River Sour Gas Plant. Deadline for submitting a Statement of Concern is September 9, 2018 in the following location:

06-057-08W5M

 

00010031-010 - Cenovus Energy Inc.

Cenovus Energy Inc. has submitted an application under the Environmental Protection and Enhancement Act for a renewal of their existing approval of the Gilby Sour Gas Plant. The deadline for submission of Statements of Concern is September 8, 2018 in the following location:

20-041-04W5M

 

00418981-001 - Crescent Point Energy Corp.

Crescent Point Energy Corp. has submitted an application under the Environmental Protection and Enhancement Act for an authorization to use treated effluent from the Village of Warburg, Alberta, for hydraulic facturing in the following location:

36-048-03W5M

 

00153105-004 - Japan Canada Oil Sands Limited

Japan Canada Oil Sands Limited has submitted an application under the Environmental Protection and Enhancement Act for an amendment to temporarily increase the daily sulphur dioxide (SO2) emission limit of the JACOS Hangingstone Expansion Facility from 2.0 to 3.0 tonnes/day (t/d) for a 6-month period. The deadline for submission of Statements of Concern is September 6, 2018 in the following locations:

06-084-10W4M
07-084-10W4M
18-084-10W4M
19-084-10W4M
30-084-10W4M
31-084-10W4M
01-084-11W4M
02-084-11W4M
03-084-11W4M
04-084-11W4M
05-084-11W4M
06-084-11W4M
07-084-11W4M
08-084-11W4M
09-084-11W4M
10-084-11W4M
11-084-11W4M
12-084-11W4M
13-084-11W4M
14-084-11W4M
15-084-11W4M
16-084-11W4M
17-084-11W4M
18-084-11W4M
19-084-11W4M
20-084-11W4M
21-084-11W4M
22-084-11W4M
23-084-11W4M
24-084-11W4M
25-084-11W4M
26-084-11W4M
27-084-11W4M
28-084-11W4M
29-084-11W4M
30-084-11W4M
31-084-11W4M
32-084-11W4M
35-084-11W4M
36-084-11W4M
01-084-12W4M
02-084-12W4M
11-084-12W4M
12-084-12W4M
13-084-12W4M
14-084-12W4M