Public Notice of Applications

Location

Sec.
-
Twp.
-
Rge.
-
Mer.
-

Meridian

W4M 9 W5M 8 W6M 2
 

Results : 1 - 10 of 19

00156181-010 - Canadian Natural Resources Limited

Canadian Natural Resources Limited has submitted an application under the Environmental Protection and Enhancement Act for an amendment of their existing approval of the Hamburg Sour Gas Plant. The amendment is to request the addition of a 475 kW Caterpillar G3412CLE compressor engine at the facility. The deadline for submission of Statements of Concern is July 20, 2018 in the following location:

29-096-11W6M

 

00265131-005 - XTO Energy Canada ULC

XTO Energy Canada ULC has submitted an amendment application under the Environmental Protection and Enhancement Act for the Kaybob Sour Gas Plant. The amendment application is in regards to Stabilizer and Facility upgrades, this includes heater additions and flare stack modifications/replacements. The facility is approximately 22 km southwest of the town of Fox Creek, Alberta. The deadline for submission of Statements of Concern is July 14, 2018 in the following location:

07-060-18W5M

 

00416135-001 - Cenovus FCCL Ltd.

Cenovus FCCL Ltd. has submitted an application for a registration for the release of yydrostatic test water greater than or equal to 1000 m^3 associated with Stage 2 of the Foster Creek West Trunk Pipeline in the following locations:

07-070-05W4M
14-070-05W4M
17-070-05W4M
18-070-05W4M
21-070-05W4M
22-070-05W4M

 

00068372-002 - Enerplus Corporation

An application has been submitted for a consent to transfer the existing Environmental Protection and Enhancement Act Code of Practice Registration for the Pelican Lake Compressor Station from Enerplus Corporation to Husky Oil Operations Limited. The deadline for submission of Statements of Concern is July 12, 2018 in the following location:

23-078-25W4M

 

00240008-006 - Connacher Oil And Gas Limited

Connacher Oil and Gas Limited has submitted a renewal application under the Environmental Protection and Enhancement Act for the Great Divide Oil Sands Project. The Project consists of two Central Processing Facilities, referred to as Pod One and Algar, and their associated installations located within Townships 81, 82, and 83, Ranges 11 and 12, west of the 4th meridian. The Project is located approximately 70 km south of the city of Fort McMurray, Alberta and is situated in the Regional Municipality of Wood Buffalo. The deadline for submission of Statements of Concern is July 12, 2018 in the following locations:

27-081-11W4M
28-081-11W4M
29-081-11W4M
30-081-11W4M
31-081-11W4M
32-081-11W4M
33-081-11W4M
34-081-11W4M
03-082-11W4M
04-082-11W4M
05-082-11W4M
06-082-11W4M
07-082-11W4M
08-082-11W4M
17-082-11W4M
18-082-11W4M
19-082-11W4M
20-082-11W4M
29-082-11W4M
30-082-11W4M
31-082-11W4M
32-082-11W4M
08-082-12W4M
09-082-12W4M
10-082-12W4M
11-082-12W4M
12-082-12W4M
13-082-12W4M
14-082-12W4M
15-082-12W4M
16-082-12W4M
17-082-12W4M
20-082-12W4M
21-082-12W4M
22-082-12W4M
23-082-12W4M
24-082-12W4M
25-082-12W4M
26-082-12W4M
27-082-12W4M
28-082-12W4M
29-082-12W4M
32-082-12W4M
33-082-12W4M
34-082-12W4M
35-082-12W4M
36-082-12W4M
02-082-13W4M
03-082-13W4M
04-082-13W4M
09-082-13W4M
10-082-13W4M
11-082-13W4M
14-082-13W4M
15-082-13W4M
23-082-13W4M
26-082-13W4M
35-082-13W4M

 

00416025-001 - Encana Corporation

Encana Corporation has requested an approval under Environmental Protection and Enhancement Act for the Pipestone Processing Facility (PPF) located at SW-7-73-8-W6M. The primary activity at the PPF is the processing of raw gas with a design capacity of 5663.5 e3m3/d (200 million standard cubic feet per day), having a greater than 1 tonne per day sulphur inlet. The PPF will separate sweet sales gas, natural gas liquids (NGL), condensate (C5+) and produced water. Deadline for submitting a Statement of Concern is July 13, 2018 in the following location:

07-073-08W6M

 

00000057-021 - Tidewater Midstream and Infrastructure Ltd.

Tidewater Midstream and Infrastructure Ltd. has requested an amendment to Ram River Sour Gas Plant approval under Environmental Protection and Enhancement Act to add a power generator and a compressor engine at the plant. Deadline for submitting a Statement of Concern is July 6, 2018 in the following location:

02-037-10W5M

 

00141258-009 - Osum Production Corp.

OSUM Production Corp. has submitted an application under the Environmental Protection and Enhancement Act for an amendment to an existing approval for the Orion Oil Sands Project. The amendment is to increase the NOx emission limits reflective of the enhanced boiler capability due to a retrofit of the burner spuds. The deadline for submitting a statement of concern is July 6, 2018 in the following locations:

15-063-03W4M
16-063-03W4M
17-063-03W4M
08-064-03W4M
09-064-03W4M
10-064-03W4M
11-064-03W4M
12-064-03W4M
14-064-03W4M
15-064-03W4M
16-064-03W4M
17-064-03W4M

 

00011556-005 - Direct Oil & Gas Inc.

Amend a previously granted EPEA code of practice for Compressor & Sweet Gas in the following location:

29-094-25W5M

 

00415592-001 - Cenovus FCCL Ltd.

Cenovus FCCL Ltd. has submitted an application under the Environmental Protection and Enhancement Act for the release of hydrostatic test water to land equalling or exceeding 1000 m3 associated with their Foster Creek West Trunk Pipeline in the following locations:

07-070-05W4M
14-070-05W4M
17-070-05W4M
18-070-05W4M
21-070-05W4M
22-070-05W4M