Public Notice of Applications

Location

Sec.
-
Twp.
-
Rge.
-
Mer.
-

Meridian

W5M 9 W4M 4 W6M 2
 

Results : 1 - 10 of 15

1911370 - Keyera Energy Ltd.

Application to transfer existing AER licences from the current licensee of record Keyera Energy Ltd. to TAQA North Ltd. Application includes 1 Pipeline Licence(s) in the following location:

33-046-16W5M

 

A10078640 - Keyera Energy Ltd.

Application to receive authorization for land related to pipeline construction in the following location:

15-070-08W6M

 

358739 - Keyera Energy Ltd.

Application under the provisions of the Pipeline Act to amend an existing licence for Natural Gas pipeline with 0 mol\kmol hydrogen sulphide (H2S) in the following location:

10-044-12W5M

 

A10078500 - Keyera Energy Ltd.

Application to receive authorization for land related to pipeline construction in the following location:

28-049-11W5M

 

360684 - Keyera Energy Ltd.

Application under the provisions of the Pipeline Act to amend an existing licence for Sour Natural Gas pipeline with 100 mol\kmol hydrogen sulphide (H2S) in the following location:

36-046-14W5M

 

359945 - Keyera Energy Ltd.

Application under the provisions of the Water Act for a Water Approval for the construction of works that will mitigate for 1.54 hectares (ha) of wetland loss through Wetland Assessment Impact Report in the following locations:

06-063-25W5M
05-063-25W5M

 

A10078160 - Keyera Energy Ltd.

Application to amend a previously authorized use of land related to a pipeline installation in the following location:

12-044-13W5M

 

356303 - Keyera Energy Ltd.

Application under the provisions of the Pipeline Act to amend an existing licence for Condensate pipeline with 0 mol\kmol hydrogen sulphide (H2S) in the following locations:

09-056-21W4M
07-055-21W4M

 

A10077856 - Keyera Energy Ltd.

Application for a new temporary field authorization in the following location:

05-045-12W5M

 

00416809-001 - Keyera Energy Ltd.

Keyera Energy Ltd. has submitted an application under the Environmental Protection and Enhancement Act for the construction and reclamation of the right of way for the Wapiti North Pipeline Project. The proposed pipeline will be 35.1 km within Townships 67 to 70 Ranges 7 and 8 West of the 6th Meridian. The proposed pipelines will transport sour gas (323.9 mm outside diameter) sour liquids (219.1 mm outside diameter) and sweet fuel gas (219.1 mm outside diameter) within a common ditch, to be constructed concurrently. The deadline for submitting a statement of concern is July 26, 2018 in the following locations:

18-067-07W6M
19-067-07W6M
24-067-08W6M
25-067-08W6M
36-067-08W6M
01-068-08W6M
02-068-08W6M
11-068-08W6M
14-068-08W6M
22-068-08W6M
23-068-08W6M
26-068-08W6M
27-068-08W6M
35-068-08W6M
02-069-08W6M
11-069-08W6M
12-069-08W6M
13-069-08W6M
24-069-08W6M
25-069-08W6M
26-069-08W6M
35-069-08W6M
02-070-08W6M
10-070-08W6M
11-070-08W6M
15-070-08W6M