1885352 - Bonavista Energy Corporation
Approved

Application to amend an approval to reflect either a company name change that has occurred since the approval was granted or a change of approval holder if the scheme has been sold or divested.

 

00392366-001 - Bonavista Energy Corporation
Approved

To receive an application for a Water Act temporary diversion licence for commercial water diversion in the following location:

19-042-08W5M

 

00392369-001 - Bonavista Energy Corporation
Approved

To receive an application for a Water Act temporary diversion licence for commercial water diversion in the following location:

10-042-08W5M

 

1885054 - Bonavista Energy Corporation
Approved

Application to construct and operate a single well with 0.00 moles per kilomole hydrogen sulfide (H2S.) in the following location:

22-050-17W5M

 

1885049 - Bonavista Energy Corporation
Approved

Application to construct and operate a single well with 0.00 moles per kilomole hydrogen sulfide (H2S.) in the following location:

22-050-17W5M

 

A10053948 - Bonavista Energy Corporation
Approved

Exemption application made under Directive 040 from providing Well Testing data in the following location:

13-50-18W5M

 

LOC170295-001 - Bonavista Energy Corporation
Approved

To receive authorization for a Licence of Occupation in the following locations:

19-055-19W5M
30-055-19W5M

 

MSL170233-001 - Bonavista Energy Corporation
Approved

To receive authorization for a Mineral Surface Lease in the following location:

19-055-19W5M

 

127021 - Bonavista Energy Corporation
Approved

To receive a reclamation certificate.

 

00388695-001 - Bonavista Energy Corporation
Approved

Bonavista Energy Corporation has submitted an application under the Water Act to propose an energy lease that overlaps a portion of a coniferous fen. The timber within the lease will be laid down over the timber root mat across the work area as a corduroy mat, a fabric separation layer installed with a soil cap hauled in to provide industrial operability. This construction strategy should elevate the lease over the wetland and minimize the subsidence of the lease into the wetland. The deadline for submission of Statements of Concern is February 15, 2017 in the following location: