Public Notice of Applications

Location

Sec.
-
Twp.
-
Rge.
-
Mer.
-

Meridian

W5M 5 W6M 3
 

Results : 1 - 8 of 8

00410159-001 - Tidewater Midstream and Infrastructure Ltd.

Tidewater Midstream and Infrastructure Ltd. has submitted an application under the Environmental Protection and Enhancement Act for an approval to construct the Pipestone Pipeline Project – Phase 1 (the Project). The Project consists of the construction and operation of approximately 13 pipelines and associated facilities that will be installed to service a proposed sour gas processing plant located in LSD 12 of Section 35 Township 70 Range 9 West of the 6th Meridian (west of Grande Prairie). The deadline for submitting a statement of concern is March 24, 2018 in the following locations:

07-071-07W6M
08-071-07W6M
09-071-07W6M
10-071-07W6M
14-071-07W6M
15-071-07W6M
16-071-07W6M
17-071-07W6M
31-070-08W6M
03-071-08W6M
04-071-08W6M
05-071-08W6M
06-071-08W6M
07-071-08W6M
10-071-08W6M
11-071-08W6M
12-071-08W6M
18-071-08W6M
19-071-08W6M
30-071-08W6M
34-070-09W6M
35-070-09W6M
36-070-09W6M

 

A10070852 - Tidewater Midstream and Infrastructure Ltd.

Extension to an existing license approval expiry date for a pipeline pursuant to D056 in the following location:

30-048-12W5M

 

A10070764 - Tidewater Midstream and Infrastructure Ltd.

Transfer of ownership of a approved disposition from one company to another in the following locations:

35-076-05W5M
34-076-05W5M
26-076-05W5M
25-076-05W5M
24-076-05W5M
02-077-05W5M

 

00016937-014 - Tidewater Midstream and Infrastructure Ltd.

Tidewater Midstream and Infrastructure Ltd. has requested an amendment under Environmental Protection and Enhancement Act to amend the Approval from Operational to Reclamation Phase. Deadline for submitting a Statement of Concern is March 4, 2018 in the following location:

23-064-06W5M

 

166592 - Tidewater Midstream and Infrastructure Ltd.

Application under the provisions of the Pipeline Act to amend an existing licence for Fuel Gas pipeline with 0 mol\kmol hydrogen sulphide (H2S) in the following locations:

34-072-10W6M
27-072-10W6M
02-073-10W6M

 

00136218-007 - Tidewater Midstream and Infrastructure Ltd.

Tidewater Midstream and Infrastructure Ltd. has requested an amendment under Environmental Protection and Enhancement Act to amend the approval from Operational to Reclamation Phase for Clayhurst Sour Gas Plant. Deadline for submitting a Statement of Concern is March 3, 2018 in the following location:

13-083-05W6M

 

1906598 - Tidewater Midstream and Infrastructure Ltd.

Application to transfer existing AER licences from the current licensee of record Tidewater Midstream and Infrastructure Ltd. to Deltastream Energy Corporation. Application includes 1 Pipeline Licence(s) in the following locations:

24-076-05W5M
02-077-05W5M

 

1905448 - Tidewater Midstream and Infrastructure Ltd.

Application to amend an existing licence for a single well with greater than or equal to 0.3 cubic metres per second (m3/s) but with less than 2.0 cubic metres per second (m3/s) hydrogen sulfide (H2S) release rate in the following location:

08-048-13W5M